zoukankan      html  css  js  c++  java
  • Collecting Bugs poj2096 概率DP

                                                                Collecting Bugs
    Time Limit: 10000MS   Memory Limit: 64000K
    Total Submissions: 1899   Accepted: 901
    Case Time Limit: 2000MS   Special Judge

    Description

    Ivan is fond of collecting. Unlike other people who collect post stamps, coins or other material stuff, he collects software bugs. When Ivan gets a new program, he classifies all possible bugs into n categories. Each day he discovers exactly one bug in the program and adds information about it and its category into a spreadsheet. When he finds bugs in all bug categories, he calls the program disgusting, publishes this spreadsheet on his home page, and forgets completely about the program. 
    Two companies, Macrosoft and Microhard are in tight competition. Microhard wants to decrease sales of one Macrosoft program. They hire Ivan to prove that the program in question is disgusting. However, Ivan has a complicated problem. This new program has s subcomponents, and finding bugs of all types in each subcomponent would take too long before the target could be reached. So Ivan and Microhard agreed to use a simpler criteria --- Ivan should find at least one bug in each subsystem and at least one bug of each category. 
    Macrosoft knows about these plans and it wants to estimate the time that is required for Ivan to call its program disgusting. It's important because the company releases a new version soon, so it can correct its plans and release it quicker. Nobody would be interested in Ivan's opinion about the reliability of the obsolete version. 
    A bug found in the program can be of any category with equal probability. Similarly, the bug can be found in any given subsystem with equal probability. Any particular bug cannot belong to two different categories or happen simultaneously in two different subsystems. The number of bugs in the program is almost infinite, so the probability of finding a new bug of some category in some subsystem does not reduce after finding any number of bugs of that category in that subsystem. 
    Find an average time (in days of Ivan's work) required to name the program disgusting.

    Input

    Input file contains two integer numbers, n and s (0 < n, s <= 1 000).

    Output

    Output the expectation of the Ivan's working days needed to call the program disgusting, accurate to 4 digits after the decimal point.

    Sample Input

    1 2

    Sample Output

    3.0000



     1 #include <iostream>
     2 #include <string.h>
     3 #include <stdio.h>
     4 using namespace std;
     5 double dp[2000][2000];
     6 int main()
     7 {
     8     int n,s,i,j;
     9     cin>>n>>s;
    10     memset(dp,0,sizeof(dp));
    11     for(i=n;i>=0;i--)
    12     {
    13         for(j=s;j>=0;j--)
    14         {
    15             if(i==n&&j==s)continue;
    16             dp[i][j]=(n*s+(n-i)*j*dp[i+1][j]+i*(s-j)*dp[i][j+1]+(n-i)*(s-j)*dp[i+1][j+1])/(1.0*n*s-i*j);
    17         }
    18     }
    19     printf("%.4lf
    ",dp[0][0]);
    20 }
    View Code
  • 相关阅读:
    只需 4 步,手把手教你如何实现滤镜功能
    paip.提升用户体验---c++ qt自定义窗体(1)---标题栏的绘制
    socket网络编程的一些基础知识
    图像处理、模式识别、模式分类、机器视觉推荐图书
    数据挖掘、机器学习和模式识别关系与区别
    Qt4_VS10 程序打包发布
    Qt之多线程
    QT中.pro文件的写法
    高斯定理的证明
    《Linear Algebra and Its Applications》-chaper3-行列式-行列式初等变换
  • 原文地址:https://www.cnblogs.com/ERKE/p/3576160.html
Copyright © 2011-2022 走看看