zoukankan      html  css  js  c++  java
  • hw2

    代码如下:

    1)Date(String s)那块我注释出来的那一块,把for语句里改成j<s.length()也可以运行出来。

    2)想问一下大家是怎么想到用match和split的方法的?

    3)difference那块可以用下面两句改写,很巧妙。

    else if (isBefore(d)) 
    133      return -d.difference(this); 

    4)作业做了很久,但真的有对之前lecture没懂的地方有了更多的认识



    package homework2;
    
    /* Date.java */
    
    import java.io.*;
    
    class Date {
    	private int month;
    	private int day;
    	private int year;
      /* Put your private data fields here. */
    
      /** Constructs a date with the given month, day and year.   If the date is
       *  not valid, the entire program will halt with an error message.
       *  @param month is a month, numbered in the range 1...12.
       *  @param day is between 1 and the number of days in the given month.
       *  @param year is the year in question, with no digits omitted.
       */
      public Date(int month, int day, int year) {
    	  if(isValidDate(month,day,year)!=true) {  
    		  System.out.println("The date is not valid");
    	  }else {
    		  this.day=day;
    		  this.month=month;
    		  this.year=year;
    	  }
      }
    
    
      /** Constructs a Date object corresponding to the given string.
       *  @param s should be a string of the form "month/day/year" where month must
       *  be one or two digits, day must be one or two digits, and year must be
       *  between 1 and 4 digits.  If s does not match these requirements or is not
       *  a valid date, the program halts with an error message.
       */
      public Date(String s) {
    	 if(s.matches("\d{1,2}\/\d{1,2}\/\d{1,4}")){
              String[] d=s.split("/");
              month=Integer.parseInt(d[0]);
              day=Integer.parseInt(d[1]);
              year=Integer.parseInt(d[2]);
          }else System.out.println("error Date(String s)");
    
      }
    	 
    	  
    	/* int[] line=new int[2];
    	  int i=0;
    	  for(int j=0;j<=s.length();j++) {
    		  char result=s.charAt(j);
    		  if(result=='/') {
    			  line[i]=j;
    			  i++; 
    		  }
    	  }
    	  int stringmonth= Integer.parseInt(s.substring(0,line[0]));
    	  int stringday= Integer.parseInt(s.substring(line[0]+1,line[1]));
    	  int stringyear= Integer.parseInt(s.substring(line[1]+1,s.length()));
    	  if(stringmonth>=1&&stringmonth<=12) {
    		  if(stringday>=1&&stringday<=31) {
    			  if(stringyear>=1&&stringyear<=9999) {
    				  month=stringmonth;
    				  day=stringday;
    				  year=stringyear;
    			  }else {
    				  System.out.println("error");
    			  }
    		  }
    	  }
      }*/
    
      /** Checks whether the given year is a leap year.
       *  @return true if and only if the input year is a leap year.
       */
      public static boolean isLeapYear(int year) {
    	  if((year%400==0)||((year%400!=0)&&(year%100!=0)&&(year%4==0))) {
    		  return true;
    	  }else {
    		  return false;
    	  }
                         // replace this line with your solution
      }
    
      /** Returns the number of days in a given month.
       *  @param month is a month, numbered in the range 1...12.
       *  @param year is the year in question, with no digits omitted.
       *  @return the number of days in the given month.
       */
      public static int daysInMonth(int month, int year) {
    	  /*System.out.print("days in month "+month+" is:");*/
    	  if(month==2) {
    		  if(isLeapYear(year)) {
    			  return 29;
    		  }else return 28;
    	  }else
    		  switch(month) {
    			  case 4:
    			  case 6:
    			  case 9:
    			  case 11:
    				  return 30;	
    			  default:
    				  return 31;
    			}
    		  }
      	// replace this line with your solution
    
      /** Checks whether the given date is valid.
       *  @return true if and only if month/day/year constitute a valid date.
       *
       *  Years prior to A.D. 1 are NOT valid.
       */
      public static boolean isValidDate(int month, int day, int year) {
    	  /*System.out.print("The given date "+month+"/"+day+"/"+year+" is:");*/
    	  if(month>=1&&month<=12&&day>=1&&day<=daysInMonth(month,year)&&year>=1) {
    		return true;
    	  }else {
    		return false;
    	  }
      }
    		  // replace this line with your solution
     
      /** Returns a string representation of this date in the form month/day/year.
       *  The month, day, and year are expressed in full as integers; for example,
       *  12/7/2006 or 3/21/407.
       *  @return a String representation of this date.
       */
      public String toString() {
    	  return month+"/"+day+"/"+year;                // replace this line with your solution
      }
    
      /** Determines whether this Date is before the Date d.
       *  @return true if and only if this Date is before d. 
       */
      public boolean isBefore(Date d) {
    	  if (this.year<d.year) {
    		  return true;
    	  }else if(this.year==d.year) {
    		  if(this.month<d.month) {
    			  return true;
    		  }else if(this.month==d.month) {
    			  if(this.day<d.day) {
    				  return true;
    			  }else return false;
    		  }else return false;
    	  } else return false; 
    
                              // replace this line with your solution
      }
    
      /** Determines whether this Date is after the Date d.
       *  @return true if and only if this Date is after d. 
       */
      public boolean isAfter(Date d) {
    	  if(!isBefore(d)&&d!=this) {
    		  return true;
    	  }else return false;
                              // replace this line with your solution
      }
    
      /** Returns the number of this Date in the year.
       *  @return a number n in the range 1...366, inclusive, such that this Date
       *  is the nth day of its year.  (366 is used only for December 31 in a leap
       *  year.)
       */
      public int dayInYear() {
    	  int count=0;
    	  for(int j=this.month-1;j>0;j--) {
    		  count+=daysInMonth(j,this.year);		  
    	  }
    	  count+=this.day;
    	  return count;                           // replace this line with your solution
      }
    
      /** Determines the difference in days between d and this Date.  For example,
       *  if this Date is 12/15/2012 and d is 12/14/2012, the difference is 1.
       *  If this Date occurs before d, the result is negative.
       *  @return the difference in days between d and this date.
       */
      public int difference(Date d) {
    	 int total=0;
    	 if(isAfter(d)) {
    		 for(int j=d.year;j<this.year;j++) {
    			 if(isLeapYear(j)) {
    				  total+=366;
    			  }else {
    				  total+=365;
    			  }
    			}
    		return (total+this.dayInYear()-d.dayInYear());
    	 }else 
    		 if(isBefore(d)) {
    		 for(int j=this.year;j<d.year;j++) {
    			 if(isLeapYear(j)) {
    				  total+=366;
    			  }else {
    				  total+=365;
    			  }
    			}
    		 	return -(total+d.dayInYear()-this.dayInYear());
    		 }
    			else return 0;
      }
    //replace this line with your solution
      
      public static void main(String[] argv) {
        System.out.println("
    Testing constructors.");
        Date d1 = new Date(1, 1, 1);
        System.out.println("Date should be 1/1/1: " + d1);
        d1 = new Date("2/4/2");
        System.out.println("Date should be 2/4/2: " + d1);
        d1 = new Date("2/29/2000");
        System.out.println("Date should be 2/29/2000: " + d1);
        d1 = new Date("2/29/1904");
        System.out.println("Date should be 2/29/1904: " + d1);
    
        d1 = new Date(12, 31, 1975);
        System.out.println("Date should be 12/31/1975: " + d1);
        Date d2 = new Date("1/1/1976");
        System.out.println("Date should be 1/1/1976: " + d2);
        Date d3 = new Date("1/2/1976");
        System.out.println("Date should be 1/2/1976: " + d3);
    
        Date d4 = new Date("2/27/1977");
        Date d5 = new Date("8/31/2110");
    
        System.out.println("
    Testing the isLeapYear function!");
        int y1=2014;
        System.out.println("That "+y1+" is leap year should be:"+isLeapYear(y1));
        int y2=1900;
        System.out.println("That "+y2+" is leap year should be:"+isLeapYear(y2));
        int y3=1600;
        System.out.println("That "+y3+" is leap year should be:"+isLeapYear(y3));
        int y4=2012;
        System.out.println("That "+y4+" is leap year should be:"+isLeapYear(y4));
        /* I recommend you write code to test the isLeapYear function! */
    
        System.out.println("
    Testing before and after.");
        System.out.println(d2 + " after " + d1 + " should be true: " + 
                           d2.isAfter(d1));
        System.out.println(d3 + " after " + d2 + " should be true: " + 
                           d3.isAfter(d2));
        System.out.println(d1 + " after " + d1 + " should be false: " + 
                           d1.isAfter(d1));
        System.out.println(d1 + " after " + d2 + " should be false: " + 
                           d1.isAfter(d2));
        System.out.println(d2 + " after " + d3 + " should be false: " + 
                           d2.isAfter(d3));
    
        System.out.println(d1 + " before " + d2 + " should be true: " + 
                           d1.isBefore(d2));
        System.out.println(d2 + " before " + d3 + " should be true: " + 
                           d2.isBefore(d3));
        System.out.println(d1 + " before " + d1 + " should be false: " + 
                           d1.isBefore(d1));
        System.out.println(d2 + " before " + d1 + " should be false: " + 
                           d2.isBefore(d1));
        System.out.println(d3 + " before " + d2 + " should be false: " + 
                           d3.isBefore(d2));
    
        System.out.println("
    Testing difference.");
        System.out.println(d1 + " - " + d1  + " should be 0: " + 
                           d1.difference(d1));
        System.out.println(d2 + " - " + d1  + " should be 1: " + 
                           d2.difference(d1));
        System.out.println(d3 + " - " + d1  + " should be 2: " + 
                           d3.difference(d1));
        System.out.println(d3 + " - " + d4  + " should be -422: " + 
                           d3.difference(d4));
        System.out.println(d5 + " - " + d4  + " should be 48762: " + 
                           d5.difference(d4));
    
      }
    }
    

    运行结果:

  • 相关阅读:
    C# 数据的序列化存取
    C# 移动端与PC端的数据交互
    C# Socket 简易的图片传输
    C# Socket学习笔记二
    C# Socket学习笔记一
    unity 小地图的制作
    Unity Layout碰撞检测
    Unity sqlite学习笔记一
    玩家信息血条及伤害值随主角移动
    C# 热水器
  • 原文地址:https://www.cnblogs.com/Miaostarer/p/7192546.html
Copyright © 2011-2022 走看看