zoukankan      html  css  js  c++  java
  • 英语-20210304

    it is the controlling area
    we have configured
    we have also assigned the company code
    let me activate the other things
    this company code is assigned to this
    the standard hierarchy also we have created
    cost calculation
    we have the material cost
    we have the other cost components
    like your labor cost activity
    we need to integrate with co
    we have two type of expenditure
    lot of reconciliation we have to do here
    we need to do the distribution of cost of production cost centers
    then we have activity allocation
    we are going to do the profitability
    we need to do the co and sd integration
    so cost center hierarchy we have created
    it is my assumption arrest
    it is indeed succumbs consultants 这确实让咨询师们屈服了
    you can do this wreck of a reference configuration 您可以通过参考配置来实现这种破坏
    we have the finance department
    we have maintenance department
    cost is incurred everywhere 到处都有成本
    we are going to reallocate 我们要重新分配
    range maybe you will fall distribute in a different way where 范围也许你以不同的方式分布
    we are going to incur for this all departments 我们将为此招致所有部门
    allocate the cost 分配成本
    may be in a percentage we are gonna do like 可能是以百分比
    should be on some real figures 应该用真实的数据
    mine is more realistic 我的比较现实
    it is for me for planning purpose and for reporting purpose 这是给我的规划和报告目的
    grooves are not cost object 凹槽不是成本对象
    i am going to create cost center
    go to groups and you can see here
    here one concept is there materializer which is not
    how to calculate the stock price or the cost
    the cost price will be calculated in co
    this cost is calculated something
    we did the valuation
    if metal lase configuration will be there then 金属激光配置
    valuation area is nothing but plant 估价区域就是厂房
    it is not topic
    it is actually one sub module
    if you think controlling is interesting or you want to do controlling you can
    add the version for planning purpose 为规划目的添加版本
    cost center accounting, cost element, internal order
    you try to parallel with me 试着跟上我
    if you use the nephew
    but i requested it wants to make it available to download actually
    i will check with him
    so go to standard hierarchy
    so different costs center categories are there

  • 相关阅读:
    cuda实践2
    对旋转矩阵R做(行)初等变换会发生什么?
    关于最短路径问题:Dijkstra与Floyd算法
    深入理解JavaScript系列
    jquery的$.extend和$.fn.extend作用及区别
    知道WCF的地址用工厂通道方式快速调用WCF
    WCF大数据量传输解决方案
    系统上线后WCF服务最近经常死掉的原因分析总结
    Microsoft Web Application Stress Tool 使用
    标识符解析在闭包中理解
  • 原文地址:https://www.cnblogs.com/RogerLu/p/14480354.html
Copyright © 2011-2022 走看看