zoukankan      html  css  js  c++  java
  • POJ1083 Moving Tables

    Time Limit: 1000MS   Memory Limit: 10000K
    Total Submissions: 30138   Accepted: 10038

    Description

    The famous ACM (Advanced Computer Maker) Company has rented a floor of a building whose shape is in the following figure.

    The floor has 200 rooms each on the north side and south side along the corridor. Recently the Company made a plan to reform its system. The reform includes moving a lot of tables between rooms. Because the corridor is narrow and all the tables are big, only one table can pass through the corridor. Some plan is needed to make the moving efficient. The manager figured out the following plan: Moving a table from a room to another room can be done within 10 minutes. When moving a table from room i to room j, the part of the corridor between the front of room i and the front of room j is used. So, during each 10 minutes, several moving between two rooms not sharing the same part of the corridor will be done simultaneously. To make it clear the manager illustrated the possible cases and impossible cases of simultaneous moving.

    For each room, at most one table will be either moved in or moved out. Now, the manager seeks out a method to minimize the time to move all the tables. Your job is to write a program to solve the manager's problem.

    Input

    The input consists of T test cases. The number of test cases ) (T is given in the first line of the input file. Each test case begins with a line containing an integer N , 1 <= N <= 200, that represents the number of tables to move.
    Each of the following N lines contains two positive integers s and t, representing that a table is to move from room number s to room number t each room number appears at most once in the N lines). From the 3 + N -rd
    line, the remaining test cases are listed in the same manner as above.

    Output

    The output should contain the minimum time in minutes to complete the moving, one per line.

    Sample Input

    3 
    4 
    10 20 
    30 40 
    50 60 
    70 80 
    2 
    1 3 
    2 200 
    3 
    10 100 
    20 80 
    30 50 
    

    Sample Output

    10
    20
    30

    Source

    贪心模拟一遍即可。开个数组记录走廊上每格的占用时间,每次搬桌子就把起终点之间的格子用时+10,最后找个最大值

     1 /**/
     2 #include<iostream>
     3 #include<cstdio>
     4 #include<cmath>
     5 #include<cstring>
     6 #include<algorithm>
     7 using namespace std;
     8 const int mxn=300;
     9 int n;
    10 int time[mxn];
    11 int ans;
    12 int main(){
    13     int T;
    14     scanf("%d",&T);
    15     int i,j;
    16     while(T--){
    17         memset(time,0,sizeof time);
    18         scanf("%d",&n);
    19         int x,y;
    20         for(i=0;i<n;i++){
    21             scanf("%d%d",&x,&y);
    22             if(x>y)swap(x,y);
    23             int st=(x-1)/2;
    24             int ed=(y-1)/2;
    25             for(j=st;j<=ed;j++)time[j]+=10;
    26         }
    27         ans=0;
    28         for(j=1;j<=200;j++)ans=max(ans,time[j]);
    29         printf("%d
    ",ans);
    30     }
    31     return 0;
    32 }
  • 相关阅读:
    Asp.net core中间件实现原理及用法解说
    C#中,async关键字到底起什么作用?
    C# 中的Async 和 Await 的用法详解
    .NET委托,事件和Lambda表达式
    docker push到私有仓库 docker push 镜像到harbor
    shell tput的用法
    Shell中获取脚本的绝对路径$( cd "$( dirname "$0" )" && pwd)
    shell脚本中 "set -e" 的作用
    从旧goadddy账号转移域名到新的goaddy账号中
    git制作patch的步骤
  • 原文地址:https://www.cnblogs.com/SilverNebula/p/5716116.html
Copyright © 2011-2022 走看看