zoukankan      html  css  js  c++  java
  • The Triangle (简单动态规划)

    7
    3   8
    8   1   0
    2   7   4   4
    4   5   2   6   5
    
    (Figure 1)

    Figure 1 shows a number triangle. Write a program that calculates the highest sum of numbers passed on a route that starts at the top and ends somewhere on the base. Each step can go either diagonally down to the left or diagonally down to the right.

    Input

    Your program is to read from standard input. The first line contains one integer N: the number of rows in the triangle. The following N lines describe the data of the triangle. The number of rows in the triangle is > 1 but <= 100. The numbers in the triangle, all integers, are between 0 and 99.

    Output

    Your program is to write to standard output. The highest sum is written as an integer.

    Sample Input

    5
    7
    3 8
    8 1 0 
    2 7 4 4
    4 5 2 6 5

    Sample Output

    30

    题解:求取数字三角形从顶到底和最大的一条路,每次只能往左下或右下走,那我们的思路就是从底到顶动态规划即可,每次只需要取最大的,那到顶一定是最大的

    代码:

    #include<cstdio>
    #include<iostream>
    #include<algorithm>
    #include<cstring>
    
    using namespace std;
    
    int main()
    {
    	int n;
    	scanf("%d",&n);
    	int dp[105][105];
    	for(int t=0;t<n;t++)
    	{
    		for(int j=0;j<=t;j++)
    		{
    		
    		scanf("%d",&dp[t][j]);
    	    }
    	}
    	for(int t=n-2;t>=0;t--)
    	{
    		for(int j=0;j<=t;j++)
    		{
    			dp[t][j]+=max(dp[t+1][j+1],dp[t+1][j]);
    		}
    	}
    	printf("%d
    ",dp[0][0]);
    	
    	
    	return 0;
    }
  • 相关阅读:
    Oracle时间日期操作
    c# 语音卡控制语音卡实现电话录音
    ORACLE日期时间函数大全
    oracle的表分区
    如何应付表数据过大的查询问题?(如何尽量避免大表关联)[转]
    优化SQL Server数据库
    oracle知识回顾
    增强现实 artoolkit
    高负载系统架构设计
    三套.net支持库
  • 原文地址:https://www.cnblogs.com/Staceyacm/p/10782054.html
Copyright © 2011-2022 走看看