zoukankan      html  css  js  c++  java
  • POJ 2263 Heavy Cargo(Floyd + map)

    Heavy Cargo
    Time Limit: 1000MS   Memory Limit: 65536K
    Total Submissions: 3768   Accepted: 2013

    Description

    Big Johnsson Trucks Inc. is a company specialized in manufacturing big trucks. Their latest model, the Godzilla V12, is so big that the amount of cargo you can transport with it is never limited by the truck itself. It is only limited by the weight restrictions that apply for the roads along the path you want to drive.

    Given start and destination city, your job is to determine the maximum load of the Godzilla V12 so that there still exists a path between the two specified cities.

    Input

    The input will contain one or more test cases. The first line of each test case will contain two integers: the number of cities n (2<=n<=200) and the number of road segments r (1<=r<=19900) making up the street network.
    Then r lines will follow, each one describing one road segment by naming the two cities connected by the segment and giving the weight limit for trucks that use this segment. Names are not longer than 30 characters and do not contain white-space characters. Weight limits are integers in the range 0 - 10000. Roads can always be travelled in both directions.
    The last line of the test case contains two city names: start and destination.
    Input will be terminated by two values of 0 for n and r.

    Output

    For each test case, print three lines:
    • a line saying "Scenario #x" where x is the number of the test case
    • a line saying "y tons" where y is the maximum possible load
    • a blank line

    Sample Input

    4 3
    Karlsruhe Stuttgart 100
    Stuttgart Ulm 80
    Ulm Muenchen 120
    Karlsruhe Muenchen
    5 5
    Karlsruhe Stuttgart 100
    Stuttgart Ulm 80
    Ulm Muenchen 120
    Karlsruhe Hamburg 220
    Hamburg Muenchen 170
    Muenchen Karlsruhe
    0 0
    

    Sample Output

    Scenario #1
    80 tons
     
    Scenario #2
    170 tons
    

    Source

    题意:求各城市每条给定起点和终点间通路的最小负载,并据此求出所有最小负载中的最大值.
    思路:题目给的是城市名用map.
    收获:map用法 + Floyd
    #include <cstdio>
    #include <iostream>
    #include <cstdlib>
    #include <algorithm>
    #include <ctime>
    #include <cmath>
    #include <string>
    #include <cstring>
    #include <stack>
    #include <queue>
    #include <list>
    #include <vector>
    #include <map>
    #include <set>
    using namespace std;
    
    const int INF=0x3f3f3f3f;
    const double eps=1e-10;
    const double PI=acos(-1.0);
    #define maxn 500
    
    map<string, int> a;
    char s1[32];
    char s2[32];
    int  c[maxn][maxn];
    int v[maxn][maxn];
    int pre[maxn][maxn];
    int main()
    {
        int n, m, w;
        int cas = 0;
        while(~scanf("%d%d",&n,&m)&&(n+m))
        {
            int cnt = 0;
            memset(c, 0, sizeof c);
            for(int i = 0; i < m; i++)
            {
                scanf("%s%s%d", s1, s2, &w);
                if(!a.count(s1))
                a[s1] = cnt++;
                if(!a.count(s2))
                a[s2] = cnt++;
                c[a[s1]][a[s2]] = c[a[s2]][a[s1]] = w;
            }
    //    map<string, int>::iterator it;
    //    for(it=a.begin();it!=a.end();++it)
    //        cout<<"key: "<<it->first <<" value: "<<it->second<<endl;
            for(int i = 0; i < n; i++)
                for(int j = 0; j < n; j++)
                {
                    v[i][j] = c[i][j];
                    //pre[i][j] = i;
                }
    
            for(int k = 0; k < n; k++)
                for(int i = 0; i<n; i++)
                    for(int j = 0; j < n; j++)
                    {
                        v[i][j] = max(v[i][j], min(v[i][k],v[k][j]));
                       //pre[i][j] = pre[k][j];
                    }
    
            scanf("%s%s",s1,s2);
    
            printf("Scenario #%d
    ", ++cas);
            printf("%d tons
    ",v[a[s1]][a[s2]]);
            puts("");
        }
        return 0;
    }
  • 相关阅读:
    Java calendar类学习笔记
    Anaconda 学习笔记
    第八周作业
    第七次作业
    第六周作业
    第五次作业
    用户调研方法之焦点小组
    第三周作业
    软件工作量的评估方法有哪些
    软件质量保证与测试(--作业--)
  • 原文地址:https://www.cnblogs.com/ZP-Better/p/4714803.html
Copyright © 2011-2022 走看看