zoukankan      html  css  js  c++  java
  • AWR快照管理

    创建快照:

    SQL> exec dbms_workload_repository.create_snapshot();

    删除快照:

    SQL> exec dbms_workload_repository.drop_snapshot_range(low_snap_id=>2542,high_snap_id=>2544,dbid=>1725496767);

    修改快照设置:

    SQL> exec dbms_workload_repository.modify_snapshot_settings(retention=>43200,interval=>30,topsql=>100,dbid=>1725496767);

    查看快照:

    SQL> select snap_id,dbid,instance_number,startup_time,begin_interval_time,end_interval_time,flush_elapsed,snap_level,error_count,snap_flag,snap_timezone from dba_hist_snapshot;
    
     SNAP_ID       DBID INSTANCE_NUMBER STARTUP_TIME              BEGIN_INTERVAL_TIME       END_INTERVAL_TIME         FLUSH_ELAPSED      SNAP_LEVEL ERROR_COUNT  SNAP_FLAG SNAP_TIMEZONE
    -------- ---------- --------------- ------------------------- ------------------------- ------------------------- ------------------ ---------- ----------- ---------- -------------
        2412 1725496767               1 26-OCT-15 08.41.58.000 AM 30-OCT-15 09.00.04.802 PM 30-OCT-15 10.00.06.349 PM +00000 00:00:00.1           1           0          0 +0 08:00:00
    
    SQL> 
  • 相关阅读:
    冲刺阶段第三天
    冲刺阶段第二天
    冲刺阶段第一天
    工作项估计
    学习进度条(7-9周)
    团队计划会议01
    第一次冲刺阶段(一)
    软件项目团队报告
    团队项目会议第一次
    团队开发项目需求简介
  • 原文地址:https://www.cnblogs.com/abclife/p/4939533.html
Copyright © 2011-2022 走看看