  • POJ 1949 Chores

    Farmer John's family pitches in with the chores during milking, doing all the chores as quickly as possible. At FJ's house, some chores cannot be started until others have been completed, e.g., it is impossible to wash the cows until they are in the stalls. 

    Farmer John has a list of N (3 <= N <= 10,000) chores that must be completed. Each chore requires an integer time (1 <= length of time <= 100) to complete and there may be other chores that must be completed before this chore is started. We will call these prerequisite chores. At least one chore has no prerequisite: the very first one, number 1. Farmer John's list of chores is nicely ordered, and chore K (K > 1) can have only chores 1,.K-1 as prerequisites. Write a program that reads a list of chores from 1 to N with associated times and all perquisite chores. Now calculate the shortest time it will take to complete all N chores. Of course, chores that do not depend on each other can be performed simultaneously.

    Input

    * Line 1: One integer, N 

    * Lines 2..N+1: N lines, each with several space-separated integers. Line 2 contains chore 1; line 3 contains chore 2, and so on. Each line contains the length of time to complete the chore, the number of the prerequisites, Pi, (0 <= Pi <= 100), and the Pi prerequisites (range 1..N, of course). 

    Output

    A single line with an integer which is the least amount of time required to perform all the chores. 

    Sample Input

    7
    5 0
    1 1 1
    3 1 2
    6 1 1
    1 2 2 4
    8 2 2 4
    4 3 3 5 6
    

    Sample Output

    23
    

    Hint

    [Here is one task schedule:
    
    Chore 1 starts at time 0, ends at time 5.
    Chore 2 starts at time 5, ends at time 6.
    Chore 3 starts at time 6, ends at time 9.
    Chore 4 starts at time 5, ends at time 11.
    Chore 5 starts at time 11, ends at time 12.
    Chore 6 starts at time 11, ends at time 19.
    Chore 7 starts at time 19, ends at time 23.
    ]
    题解:树形DP入门题。从根节点往下依次更新出每一个节点的最短时间,则该最短时间的最大值即为:完成家务的最短时间。
    参考代码为:
    #include <iostream>
    #include <cstring>
    using namespace std;
    const int maxn=10005;
    int c[maxn],n[maxn],dp[maxn];
     
    int main()
    {
    	ios::sync_with_stdio(false);
    	cin.tie(0);
       	int N,temp,sum=-maxn; 
       	memset(dp,0,sizeof dp);
       	cin>>N;
       	for(int i=1;i<=N;i++)
       {
        	cin>>c[i]>>n[i];  
        	if(i==1) dp[i]=c[i];
        	else
    		{
           	 	int max=-maxn;
            	if(n[i]==0) dp[i]=c[i];
            	else
    			{
                	for(int j=0;j<n[i];j++)
    				{
                    	cin>>temp;
                    	if(dp[temp]>max) max=dp[temp];
                	}
                	dp[i]=max+c[i];
            	}
        	}
          	if(dp[i]>sum) sum=dp[i];
       	}   
       	cout<<sum<<endl;
        return 0;
    }
    
    /*
    7
    5 0
    1 1 1
    3 1 2
    6 1 1
    1 2 2 4
    8 2 2 4
    4 3 3 5 6
    */
    

      

  • 相关阅读:
    ql语句中left join和inner join中的on与where的区别分析
    C#如何通过属性名称反射出属性本身
    mvc中查询字符串请求过长
    SQL Server 中 EXEC 与 SP_EXECUTESQL 的区别
    后台二进制文件 在前台下载方法总结
    C#中try catch finally的执行顺序
    python生成随机密码
    Bridged(桥接模式)
    NAT(地址转换模式)
    TCP协议详解
  • 原文地址:https://www.cnblogs.com/csushl/p/9409663.html
Copyright © 2011-2022 走看看