zoukankan      html  css  js  c++  java
  • OpenJ_Bailian 2393

    Yogurt factory

    Time Limit:1000MS     Memory Limit:65536KB     64bit IO Format:%I64d & %I64u

    Submit Status Practice OpenJ_Bailian 2393

    Description

    The cows have purchased a yogurt factory that makes world-famous Yucky Yogurt. Over the next N (1 <= N <= 10,000) weeks, the price of milk and labor will fluctuate weekly such that it will cost the company C_i (1 <= C_i <= 5,000) cents to produce one unit of yogurt in week i. Yucky's factory, being well-designed, can produce arbitrarily many units of yogurt each week. 

    Yucky Yogurt owns a warehouse that can store unused yogurt at a constant fee of S (1 <= S <= 100) cents per unit of yogurt per week. Fortuitously, yogurt does not spoil. Yucky Yogurt's warehouse is enormous, so it can hold arbitrarily many units of yogurt. 

    Yucky wants to find a way to make weekly deliveries of Y_i (0 <= Y_i <= 10,000) units of yogurt to its clientele (Y_i is the delivery quantity in week i). Help Yucky minimize its costs over the entire N-week period. Yogurt produced in week i, as well as any yogurt already in storage, can be used to meet Yucky's demand for that week.

    Input

    * Line 1: Two space-separated integers, N and S. 

    * Lines 2..N+1: Line i+1 contains two space-separated integers: C_i and Y_i.

    Output

    * Line 1: Line 1 contains a single integer: the minimum total cost to satisfy the yogurt schedule. Note that the total might be too large for a 32-bit integer.

    Sample Input

    4 5

    88 200

    89 400

    97 300

    91 500

    Sample Output

    126900

    Hint

    OUTPUT DETAILS: 
    In week 1, produce 200 units of yogurt and deliver all of it. In week 2, produce 700 units: deliver 400 units while storing 300 units. In week 3, deliver the 300 units that were stored. In week 4, produce and deliver 500 units. 

    题意:

           一工厂要在N周的时间生产一些单位的奶酪去销售。已知从第i(1<=i<=N)周生产一个单位奶酪的成本价格Ci和第i周的奶酪需求量Yi。奶酪可以储存,每单位的奶酪储存一周的花费为S,也就是说本周要销售的奶酪可以提前几周生产出来。问满足所有需求的最小成本是多少。

    输入:

           第一行N和S。之后N行是每一周的成本价和需求量。

    输出:

           最小成本。

    分析:

           使用贪心的思想。首先,第1周所需的奶酪必须要在第1周生产。之后的N-1周,每天需要的奶酪要么全部在当周生产,要么全部提前生产。如果当周生产比较省钱,那么当周的需求就在当周生产,并且假设如果之后的需求需要提前生产那么就在这一周生产,因为储存的价格是累周增加的。

     1 #include <cstdio>
     2 #define MAX_N 10000
     3 #define ll long long
     4 ll N,S,ans;
     5 struct week{ll p,need;}x[MAX_N + 1];
     6 int main(){
     7     scanf("%I64d%I64d",&N,&S);
     8     for(ll i = 0 ; i < N ; i++)
     9         scanf("%I64d%I64d",&x[i].p,&x[i].need);
    10     ans = x[0].need * x[0].p;
    11     ll index = 0;
    12     for(ll i = 1 ; i < N ; i++){
    13         ll pro_bef = x[index].p + S * (i - index),pro_now = x[i].p;
    14         if(pro_bef < pro_now) ans += pro_bef * x[i].need;
    15         else ans += pro_now * x[i].need,index = i;
    16     }
    17     printf("%lld
    ",ans);
    18     return 0;
    19 }
    View Code
  • 相关阅读:
    深度历险:Redis 内存模型详解
    Redis 的 8 大应用场景!
    Java并发计数器探秘
    更改系统环境设置,让alias永远生效
    GoldenGate中使用FILTER,COMPUTE 和SQLEXEC命令
    数据集成实例
    客户视角:Oracle ETL工具ODI
    OGG-00782
    Oracle过程包加密
    Concurrent Request:Inactive phase,No Manager status
  • 原文地址:https://www.cnblogs.com/cyb123456/p/5792594.html
Copyright © 2011-2022 走看看