zoukankan      html  css  js  c++  java
  • POJ

    You are assigned to design network connections between certain points in a wide area. You are given a set of points in the area, and a set of possible routes for the cables that may connect pairs of points. For each possible route between two points, you are given the length of the cable that is needed to connect the points over that route. Note that there may exist many possible routes between two given points. It is assumed that the given possible routes connect (directly or indirectly) each two points in the area.
    Your task is to design the network for the area, so that there is a connection (direct or indirect) between every two points (i.e., all the points are interconnected, but not necessarily by a direct cable), and that the total length of the used cable is minimal.

    Input

    The input file consists of a number of data sets. Each data set defines one required network. The first line of the set contains two integers: the first defines the number P of the given points, and the second the number R of given routes between the points. The following R lines define the given routes between the points, each giving three integer numbers: the first two numbers identify the points, and the third gives the length of the route. The numbers are separated with white spaces. A data set giving only one number P=0 denotes the end of the input. The data sets are separated with an empty line.
    The maximal number of points is 50. The maximal length of a given route is 100. The number of possible routes is unlimited. The nodes are identified with integers between 1 and P (inclusive). The routes between two points i and j may be given as i j or as j i.

    Output

    For each data set, print one number on a separate line that gives the total length of the cable used for the entire designed network.

    Sample Input

    1 0
    
    2 3
    1 2 37
    2 1 17
    1 2 68
    
    3 7
    1 2 19
    2 3 11
    3 1 7
    1 3 5
    2 3 89
    3 1 91
    1 2 32
    
    5 7
    1 2 5
    2 3 7
    2 4 8
    4 5 11
    3 5 10
    1 5 6
    4 2 12
    
    0
    #include<iostream>
    #include<algorithm>
    using namespace std;
    int ans=0,tot=0;
    const int N = 1e5;
    int f[200];
    struct ac{
        int v,u,w;
    }edge[N];
    bool cmp(ac a,ac b){
        return a.w<b.w;
    }
    inline int find(int x){
        if(x!=f[x])f[x]=find(f[x]);return f[x];
    }
    inline int join(int x,int y,int w){
        int fx=find(x),fy=find(y);
        if(fx!=fy){
            f[fx]=fy;ans+=w;tot++;
        }
    }
    int main()
    {    
        int n;string a,b;int m,w,cnt=0;
        while(cin>>n>>m){
            ans=tot=cnt=0;
            for(int i = 1;i <=n;++i)f[i]=i;
            for(int i = 0;i < m;++i){
                cin>>edge[i].u>>edge[i].v>>edge[i].w;
            }
            sort(edge,edge+m,cmp);
            for(int i = 0;i < m;++i){
                join(edge[i].u,edge[i].v,edge[i].w);
                if(tot==n-1)break;
            }
            cout<<ans<<endl;    
        }
        return 0;
    }
  • 相关阅读:
    二叉树(8)----第一个二叉树K层节点和二进制部分K叶节点层,递归和非递归
    android文件缓存,并SD卡创建目录未能解决和bitmap内存溢出解决
    Ubuntu Ruby On Rails安装和配置
    Atitit.升级软件的稳定性---基于数据库实现持久化 循环队列 循环队列
    ORACLE经常使用的命令
    增加 Java 有几个好习惯表现
    HTML5学习资源
    FFT 的C 语言
    MongoDB在window下的安装
    白话经典算法系列之七 堆与堆排序
  • 原文地址:https://www.cnblogs.com/h404nofound/p/11636572.html
Copyright © 2011-2022 走看看