  • timer Compliant Controller project (1)--Product introduction meeting

    Last week ,I lead the meeting for new project. i'm  very excited. The meeting is divided into the following sections.

    1 project introduce.

     The project will be an upgraded version of the existing Yitoa GPTimer. Additional features are required to facilitate the use of the Eco Compliant Controller in  multiple products. These multiple products will then include the ECC GP2 as their primary controller to meet the European Eco-design Directive 2009/125/EC, specifically LOT20 for local space heaters.

    The additional features will include (In configuration 3 only):
    1. A temperature probe (NTC).
    2. Set-point temperature readout on the LCD display.
    3. User adjustable time and temperature profiles.
    4. The ability to select one of three operating configurations. The plastic housing for the EP4078 ECC/GP2 will have the same physical dimensions as the existing Yitoa GP timer. This dictates that the 2 internal PCBs will also have the same dimensions as the PCBs in the existing GP Timer. The plastic housing will have to be modified to accommodate the wire for NTCthermistor. The NTC thermistor wire should be located in the top left hand side of the GP timer as in the photo below.

    2 designed schedule

         The product consists of several parts , hadeware, sofeware,and mechined.

      1 technical scheme selection  (according the customer data )

      2 bom and package (priority use the already existed   the pakeage need double confirm)  

      3 schematic and layout  (after review meeting is ok   )

      4 machanical cover  (It's not my responsibility )

     3 engineering schedule

        NPI( new project input)

        ES:   sep 1  

               1 we need accompled the layout and  recall pcb .

               2 propare the test specifiation for the projuct.

               3 pmc Purchase materials on duty.

               4 NPI  arrange produation

               5 PIE and ATE    prepare fixture. and FCT(include Semi-finished produst test and finshed product test )

        EP:need product 100 pcs

         pp: Hold

        MP:Hold

    4 System designed concept

     

     5 postcript

           fighting!

          hadeware designed is easy for me. but the software designed is  differcult .

    stm8L151 is same as stm32. I can find lib whtn web, but i haven't programmed in a long time .

  • 相关阅读:
    OO助教总结
    OO2019第四单元作业总结
    OO2019第三单元作业总结
    OO2019第二单元作业
    OO2019第一单元作业总结
    OO第一单元作业总结
    BUAA_OO_2020_Unit4_Summary
    BUAA_OO_2020_Unit3_Summary
    BUAA_OO_2020_Uint2_Summary
    闫金柱-OO第一单元总结
  • 原文地址:https://www.cnblogs.com/huangbaobaoi/p/7474931.html
Copyright © 2011-2022 走看看