zoukankan      html  css  js  c++  java
  • 漫谈SRM主数据迁移及同步(4. 工厂主数据篇)

    STEPS:
    1.Adjust region codes via customizing (Utilities>Adjustment)

     

    2.Replication takes place via one of three reports:

    BBP_LOCATIONS_GET_ALL:   replicates all plants where a single ERP system is in the landscape

    BBP_LOCATIONS_GET_FROM_SYSTEM:  replicates all plants from a specific ERP system

    BBP_LOCATIONS_GET_SELECTED:   replicates a single plant form a specific backend

    3.Monitor the replication via txn SLG1 in SRM
    TIPS:

    Frequently invalid region codes cause errors.  The missing regions need to be created in SRM. If recommended step 1 is carried out this avoided.

    Any other data issues usually need to be resolved in the ERP system. Usually caused by missing data.


    SAP Notes

    563180 -Locations - Replication of R/3 plants

    1353259 - Tax Jurisdiction Code not transferred fromplant to locations

    1232990- BBP_PD_MSG_ADD creates dump: Log overflows

    最后上个图

  • 相关阅读:
    洛谷 P1141 01迷宫
    洛谷 p1443
    setw
    Fliptile
    追牛
    Dungeon Master
    vim的一些基本操作
    洛谷 p1309 瑞士轮
    洛谷 p1090 合并果子
    selenium2 WebDriver 在asp.net项目中的应用
  • 原文地址:https://www.cnblogs.com/lazymango/p/1868611.html
Copyright © 2011-2022 走看看