    MRP运行参数详解

    T-CODE:MD01、MD02

    Scope of planning:

    Key with which you can combine a group of plants or MRP areas in a scope of planning.

    The plants or MRP areas that are combine in a scope of planning are planned together in a total planning run. This has the advantage that you no longer need to create a background job for each work individually.

    Processing key(处理代码) :
    NETCH (净变化计划):即只计划上次计划以后计划相关内容发生变动的物料(注意,某些物料的参数发生变动了,系统也认为计划内容没有发生变动)

    NETPL(计划周期内的净变化计划):即只在计划周期内执行净变化计划,周期外将不进行计划.

    NEUPL(重新计划)所有的物料不管有没有变动都再次计划. 如果没有Performance的考量,建议每次都选NEUPL(注意某些单项计划不能选择NEUPL),其次选NETCH.

    Create Purchase req.(创建采购申请):
    1:计划结果直接生成采购申请(PR);
    2:只在未清期间内生成采购申请(PR),未清期间外生成计划订单(Planned Order);
    3:全部生成计划订单(Planned Order).

    Delivery Schedule(交货计划表):如果MM模块启用了计划行(Schedule Line),则MRP结果如下处理:
    1:不生成计划行(Schedule Line);
    2:只有在未清期间内生成计划行(Schedule Line);
    3:全部生成计划行(Schedule Line);

    Create MRP List(创建MRP清单):设置MRP运算是否更新MRP清单(MRP List):
    1:不生成/更新
    2:根据例外信息决定
    3:全部更新/生成MRP清单(MRP List)

    Planning Mode(计划模式):
    1:不清空原先的计划订单(Planned Order);
    2:不清空,但是要重新展开他们的BOM和Routing(即按照最新的BOM和Routing);
    3:全部清空未确认的计划订单(Planned Order),重新生成.

    Scheduling(调度):
    1:按物料主数据的提前期(Lead Time)进行排产
    2:按工艺路线(Routing)进行排产

  • 相关阅读:
    php练习题之裁判打分
    OPENSUSE:安装方式
    openSUSE:下载帮助
    安装mysql时出现HTTP 500 内部服务…
    关于wamp启动是80端口被占用的问题…
    推荐15款好用的JS开发工具
    u盘美化
    wordpress怎么修改地址栏小图标
    显示桌面图标不见了
    站长必备的131个高权重外链库(转…
  • 原文地址:https://www.cnblogs.com/potatoo/p/6913095.html
Copyright © 2011-2022 走看看