zoukankan      html  css  js  c++  java
  • 研究生英语-春

    http://baijiahao.baidu.com/s?id=1599240623758772835&wfr=spider&for=pc

    stage1:the general introduction

    stage2:pverview

    stage3:body

    stage4:conclusion

    stage5:the chance for discussion

    开场白:

    Good morning, dear teachers and dear classmates! it's my honor to have the opportunity to share my study content such a distiguished and excellent classmates.i'm here to talk to you about my recent study content.

    概述:

    The subject of my presentation is path optimization algorithm.(我演讲的主题是路径优化算法。)

    Since we are currently taking a course on computational intelligence, I would like to share some information about this course for you to learn from each other.
    You might be interested in this.
    At the same time, I also want to get your help, so I hope you can come up with your  valuable Suggestions

    (因为最近我们正在上计算智能这门课,所以我就想分享一些这门课程有关的内容,供大家互相交流学习。你们也许会对这个感兴趣。同时,我也想得到大家的帮助,所以希望大家提出你们的宝贵的意见)

    I'd be grateful if you could give your ideas after the presentation.(如果你能在结束之后提出一些意见,我将会非常感激)

    My presensentation will last for three to five minutes.(我的报告将持续三到五分钟。)

    My presentation is divided into three main sections.Firstly,sencondly,thirdly,finally......(我的报告分为三个主要部分:首先介绍背景,提出模型,然后如何建模,策略,第三实现模型,算法,最后)

    模型(假设空间,就是路径规划的图)

    策略(无监督的模型,或者监督模型 经验风险最小化)

    算法(遗传算法,梯度下降算法,牛顿法)

    We define a variable called urgency to describe the Degree of Emergency / urgency degreeof each order,我们定义了一个变量叫做urgency去描述每一个订单的紧急程度

    We use the order deadline to describe the urgency 我们用订单截止时间去描述这个紧急程度

    For an order, if the delivery time is 9:00 and the order deadline is 9:30, the urgency can be described by the time difference between the two, such as 30。针对某一个订单,假如开始配送时间为9:00,订单截止时间为9:30,那么紧急程度就可以用两者之间的时间差值去描述,比如用30来描述它

    Let's say the deliveryman is delivering at v meters per second and the total length of the path is s meters假设配送员的速度为v米每秒,路径总长度为s米

     Suppose that the deliveryman's speed is v meters per second, the total length of the path is s kilometers, and the total delivery time is s/v 假设配送员的速度为v米每秒,路径总长度为s千米,总的配送时间为s/v

    So our objective function can be defined as objective function,by using total delivery time and urgency。所以我们的目标函数可以定义为objective function ,by using total delivery time and urgency。

    接下来我们要做的就是最小化目标函数的值minimize the value of objective function ,by using total delivery time and urgency。

     

     

     

    假设你是一个送餐员,你还有许多个未完成的订单,你应该按照怎样的顺序配送你的订单呢?如何去选择最短的配送路径呢?或许根据你以往的经验,去帮助你制定一个配送计划,这或许有一定的效果。但是现在,我们可以用真实有效的数据去帮助我们完成我们的目标。
    我们定义了一个叫做紧急程度的变量去描述每一个订单的紧急程度
    emergency degree
    我们用订单截止时间去描述这个紧急程度
    针对某一个订单,假如开始配送时间为9:00,订单截止时间为9:30,那么紧急程度就可以用两者之间的时间差值去描述,比如用30来描述它。
    假设配送员的速度为v米每秒,路径总长度为s千米

  • 相关阅读:
    SqlMap入门
    本地文件上载到Docker容器
    CentOS7 安装Docker-ce
    windows10 子系统(WSL) 文件位置
    慕课网-安卓工程师初养成-5-1 编程练习
    慕课网-安卓工程师初养成-4-14 Java 循环语句之多重循环
    慕课网-安卓工程师初养成-4-13 练习题
    慕课网-安卓工程师初养成-4-12 Java循环跳转语句之 continue
    慕课网-安卓工程师初养成-4-11 Java循环跳转语句之 break
    慕课网-安卓工程师初养成-4-10 练习题
  • 原文地址:https://www.cnblogs.com/sunupo/p/10852401.html
Copyright © 2011-2022 走看看