    Description

    Farmer John's family pitches in with the chores during milking, doing all the chores as quickly as possible. At FJ's house, some chores cannot be started until others have been completed, e.g., it is impossible to wash the cows until they are in the stalls.

    Farmer John has a list of N (3 <= N <= 10,000) chores that must be completed. Each chore requires an integer time (1 <= length of time <= 100) to complete and there may be other chores that must be completed before this chore is started. We will call these prerequisite chores. At least one chore has no prerequisite: the very first one, number 1. Farmer John's list of chores is nicely ordered, and chore K (K > 1) can have only chores 1,.K-1 as prerequisites. Write a program that reads a list of chores from 1 to N with associated times and all perquisite chores. Now calculate the shortest time it will take to complete all N chores. Of course, chores that do not depend on each other can be performed simultaneously.

    Input

    * Line 1: One integer, N

    * Lines 2..N+1: N lines, each with several space-separated integers. Line 2 contains chore 1; line 3 contains chore 2, and so on. Each line contains the length of time to complete the chore, the number of the prerequisites, Pi, (0 <= Pi <= 100), and the Pi prerequisites (range 1..N, of course).

    Output

    A single line with an integer which is the least amount of time required to perform all the chores.

    Sample Input

    7
    5 0
    1 1 1
    3 1 2
    6 1 1
    1 2 2 4
    8 2 2 4
    4 3 3 5 6
    

    Sample Output

    23
    

    Hint

    [Here is one task schedule:
    
    Chore 1 starts at time 0, ends at time 5.
    Chore 2 starts at time 5, ends at time 6.
    Chore 3 starts at time 6, ends at time 9.
    Chore 4 starts at time 5, ends at time 11.
    Chore 5 starts at time 11, ends at time 12.
    Chore 6 starts at time 11, ends at time 19.
    Chore 7 starts at time 19, ends at time 23.
    ]

    Source

     
    题意是,有很多项工作,每个工作有完成所需的时间,而每一个工作可能会有一些前提工作,前提工作没完成就不能做这项工作。可以有多个工作同时进行。
     
    分析:
    完成一项工作必然需要完成其所有的前提工作,因为工作是可以同时进行的,所以我可以在完成前提工作中最晚完成的那项之后,马上开始这项工作
    意思是在完成第K个任务时只有前面1~K-1个任务能够成为它都优先任务,也就是说题目给定的序列已经拓扑排序完毕,则只需要从1一直DP到n就可以了,注
    这里求的是最小时间,每次DP[i]应该等于完成之前优先任务的最大时间
     
    注意不能cin输入,会超时
     
    code:
     
    #include <iostream>
    #include <stdio.h>
    #include<memory>
    #include<stack>
    #include<string.h>
    #include<algorithm>
    using namespace std;
    #define max_v 11000
    int dp[max_v];//表示执行到第i个任务所需要的最小时间   
    //每次DP[i]应该等于完成之前优先任务的最大时间
    int main()
    {
        int n,x,y,k,ans=0;
        dp[0]=0;
        scanf("%d",&n);
        for(int i=1;i<=n;i++)
        {
            scanf("%d %d",&x,&k);
            if(k>0)
            {
                for(int j=1;j<=k;j++)
                {
                    scanf("%d",&y);
                    dp[i]=max(dp[i],dp[y]+x);
                }
            }else
            {
                dp[i]=x;
            }
            ans=max(ans,dp[i]);
        }
        printf("%d
    ",ans);
        return 0;
    }
  • 相关阅读:
    wxpython的安装

    拓扑排序
    树,二叉树,森林,三者的转换
    二叉树的遍历
    最短路径
    图的遍历
    图的最小生成树
    哈夫曼树的应用
    哈夫曼树
  • 原文地址:https://www.cnblogs.com/yinbiao/p/9407196.html
Copyright © 2011-2022 走看看