zoukankan      html  css  js  c++  java
  • POJ 2970 The lazy programmer(优先队列+贪心)



    Language:
    The lazy programmer
    Time Limit: 5000MS   Memory Limit: 65536K
    Total Submissions: 1566   Accepted: 386

    Description

    A new web-design studio, called SMART (Simply Masters of ART), employs two people. The first one is a web-designer and an executive director at the same time. The second one is a programmer. The director is so a nimble guy that the studio has already got N contracts for web site development. Each contract has a deadline di.

    It is known that the programmer is lazy. Usually he does not work as fast as he could. Therefore, under normal conditions the programmer needs bi of time to perform the contract number i. Fortunately, the guy is very greedy for money. If the director pays him xi dollars extra, he needs only (bi − ai xi) of time to do his job. But this extra payment does not influent other contract. It means that each contract should be paid separately to be done faster. The programmer is so greedy that he can do his job almost instantly if the extra payment is (bi ⁄ ai) dollars for the contract number i.

    The director has a difficult problem to solve. He needs to organize programmer’s job and, may be, assign extra payments for some of the contracts so that all contracts are performed in time. Obviously he wishes to minimize the sum of extra payments. Help the director!

    Input

    The first line of the input contains the number of contracts N (1 ≤ N ≤ 100 000, integer). Each of the next N lines describes one contract and contains integer numbers aibidi (1 ≤ aibi ≤ 10 000; 1 ≤ di ≤ 1 000 000 000) separated by spaces.

    Output

    The output needs to contain a single real number S in the only line of file. S is the minimum sum of money which the director needs to pay extra so that the programmer could perform all contracts in time. The number must have two digits after the decimal point.

    Sample Input

    2
    20 50 100
    10 100 50

    Sample Output

    5.00

    Source

    Northeastern Europe 2004, Western Subregion



    /*
    
    题意:有n个任务要完毕,每一个任务有属性 a,b,d
    	 分别代表  额外工资,完毕时间,结束时间。
    	 假设不给钱。那么完毕时间为b,给x的额外工资,那么完毕时间b变成 b-a*x
    
      求在全部任务在各自最后期限前完毕所须要给的最少的钱
    
    思路:先把任务依照结束之间排序,然后依次完毕每一个任务,假设这个任务无法完毕
          那么在前面(包含这个)任务中找到a属性最大的任务(能够再给他钱的前提),
          给钱这个腾出时间来完毕当前这个任务,而这个能够用优先队列维护
    
    
    */
    
    #include<iostream>
    #include<cstdio>
    #include<cstring>
    #include<algorithm>
    #include<cmath>
    #include<queue>
    #include<stack>
    #include<vector>
    #include<set>
    #include<map>
    
    
    #define L(x) (x<<1)
    #define R(x) (x<<1|1)
    #define MID(x,y) ((x+y)>>1)
    
    #define eps 1e-8
    typedef __int64 ll;
    
    #define fre(i,a,b)  for(i = a; i <b; i++)
    #define free(i,b,a) for(i = b; i >= a;i--)
    #define mem(t, v)   memset ((t) , v, sizeof(t))
    #define ssf(n)      scanf("%s", n)
    #define sf(n)       scanf("%d", &n)
    #define sff(a,b)    scanf("%d %d", &a, &b)
    #define sfff(a,b,c) scanf("%d %d %d", &a, &b, &c)
    #define pf          printf
    #define bug         pf("Hi
    ")
    
    using namespace std;
    
    #define INF 0x3f3f3f3f
    #define N 100005
    
    struct stud{
      int a,b,d;
      double money;
      bool operator<(const stud b) const
      {
      	return a<b.a;
      }
    
    }f[N];
    
    int cmp(stud x,stud y)
    {
    	return x.d<y.d;
    }
    
    priority_queue<stud>q;
    
    int n;
    
    int main()
    {
    	int i,j;
    	while(~scanf("%d",&n))
    	{
    		for(i=0;i<n;i++)
    			{
    				scanf("%d%d%d",&f[i].a,&f[i].b,&f[i].d);
    			    f[i].money=0;   //已经给这个任务的钱
    			}
    	    sort(f,f+n,cmp);
    
    	    while(!q.empty()) q.pop();
    	    double ans,day;
    	    ans=day=0;
    	    stud cur;
    	    for(i=0;i<n;i++)
    		{
    			q.push(f[i]);
    			day+=f[i].b;
    			while(day>f[i].d)
    			{
    				cur=q.top();
    				q.pop();
    				double temp=(double)(day-f[i].d)/cur.a; //完毕这个任务须要给cur任务的钱
    				if(temp+cur.money<(double)cur.b/cur.a)   //假设这个钱加上已经给的钱小于能够给他的钱
    				{
    					day-=temp*cur.a;
    					cur.money+=temp;
    					ans+=temp;
    					q.push(cur);
    					break;
    				}
    				else
    				{
    					temp=((double)cur.b/cur.a-cur.money);
    					day-=temp*cur.a;
    					ans+=temp;
    				}
    			}
    		}
    
    		printf("%.2f
    ",ans);
    	}
      return 0;
    }
    
    
    
    
    
    
    
    
    


    Language:
    The lazy programmer
    Time Limit: 5000MS   Memory Limit: 65536K
    Total Submissions: 1566   Accepted: 386

    Description

    A new web-design studio, called SMART (Simply Masters of ART), employs two people. The first one is a web-designer and an executive director at the same time. The second one is a programmer. The director is so a nimble guy that the studio has already got N contracts for web site development. Each contract has a deadline di.

    It is known that the programmer is lazy. Usually he does not work as fast as he could. Therefore, under normal conditions the programmer needs bi of time to perform the contract number i. Fortunately, the guy is very greedy for money. If the director pays him xi dollars extra, he needs only (bi − ai xi) of time to do his job. But this extra payment does not influent other contract. It means that each contract should be paid separately to be done faster. The programmer is so greedy that he can do his job almost instantly if the extra payment is (bi ⁄ ai) dollars for the contract number i.

    The director has a difficult problem to solve. He needs to organize programmer’s job and, may be, assign extra payments for some of the contracts so that all contracts are performed in time. Obviously he wishes to minimize the sum of extra payments. Help the director!

    Input

    The first line of the input contains the number of contracts N (1 ≤ N ≤ 100 000, integer). Each of the next N lines describes one contract and contains integer numbers aibidi (1 ≤ aibi ≤ 10 000; 1 ≤ di ≤ 1 000 000 000) separated by spaces.

    Output

    The output needs to contain a single real number S in the only line of file. S is the minimum sum of money which the director needs to pay extra so that the programmer could perform all contracts in time. The number must have two digits after the decimal point.

    Sample Input

    2
    20 50 100
    10 100 50

    Sample Output

    5.00

    Source

    Northeastern Europe 2004, Western Subregion

  • 相关阅读:
    大名鼎鼎的红黑树,你get了么?2-3树 绝对平衡 右旋转 左旋转 颜色反转
    django 数据库连接模块解析及简单长连接改造
    django settings最佳配置
    Django 多数据库联用
    初步了解Shuttle ESB
    linux 线程切换效率与进程切换效率相差究竟有多大?
    进行mysql压力測试须要注意的几点
    POJ 2762 Going from u to v or from v to u?(强联通,拓扑排序)
    linux中O(1)调度算法与全然公平(CFS)调度算法
    LeetCode 121 Best Time to Buy and Sell Stock
  • 原文地址:https://www.cnblogs.com/zfyouxi/p/5356685.html
Copyright © 2011-2022 走看看