zoukankan      html  css  js  c++  java
  • 软件项目管理常用单词解说

    以下为收集的一些软件项目管理中的常用单词简写:


    PI:Project Initiation(项目启动)
    PPL:Project Plan(制定项目计划,Establish PPL)
    SRS: Software R一些equirements Specification, 也有可能是System Requirements Specification
    STP:System Testing Plan(系统测试计划)
    HLD: High Level design,也叫General design (概要设计)
    ITP:Integration Testing Plan(集成测试计划)
    LLD: Low Level design,也叫Detail design (详细设计)
    UTP:Unit Testing Plan(单元测试计划)
    Coding(编码)
    UT:单元测试
    IT:集成测试
    ST:系统测试
    Release:产品发布
    UAT: User Acceptance Testing(用户验收测试)
    Project Closure:项目关闭
    SOW: Statement of work。
    AR:分配需求。
    COO:Chief Operation Officer(首席运营官)
    CPM:Chief Project Manager(主管项目经理)
    PM:项目经理
    QA:quality assurance(质量保证)
    SE:System Engineer
    SWE:Software engineer(软件开发工程师)
    TC:Test Controler(测试控制)
    TE:Testing Engineer(测试工程师)
    CMO:Chife Marketing Officer(首席营销官)
    MC:度量协调

    QAM:Quality Assurance Manager
    SEPG:Software Engineer Process Group(软件工程过程组)
    Process Handbook (项目过程手册)PHB
    Estimation Sheet (估计记录)EST
    Project Plan (项目计划)PPL
    conifguration Management Plan( 配置管理计划)CMP
    Software Quality Assurance Plan (软件质量保证计划)QAP
    Software Risk Management Plan (软件风险管理计划)RMP
    Test Strategy(测试策略)TST
    Work Breakdown Structure (工作分解结构)WBS
    Business Requirement Specification(业务需求说明书)BRS
    Software Requirement Specification(软件需求说明书)SRS
    System Testing plan (系统测试计划)STP
    System Testing Cases (系统测试用例)STC
    High Level Design(概要设计说明书)HLD
    Integration Testing plan (集成测试计划)ITP
    Integration Testing Cases (集成测试用例)ITC
    Low Level Design (详细设计说明书)LLD
    Unit Testing Plan ( 单元测试计划)UTP
    Unit Testing Cases (单元测试用例)UTC
    Unit Testing Report (单元测试报告)UTR
    Integration Testing Report (集成测试报告)ITR
    System Testing Report (系统测试报告)STR
    Requirements Traceability Matrix (需求跟踪矩阵)RTM
    Configuration Status Accounting (配置状态发布)CSA
    Change Request Form (变更申请表)CRF
    Weekly Status Report (项目周报)WSR
    Quality Weekly Status Report (质量工作周报)QSR
    Quality Audit Report(质量检查报告)QAR
    Quality Check List(质量检查表)QCL
    Phase Assessment Report (阶段评估报告)PAR
    Closure Report (项目总结报告)CLR
    Review Finding Form (评审发现表)RFF
    Minutes of Meeting (会议纪要)MOM
    Metrics Sheet (度量表)MTX
    ConsistanceCheckForm(一致性检查表)CCF
    Baseline Audit Form(基线审计表)BAF
    Program Trace Form(问题跟踪表)PTF

  • 相关阅读:
    企业搜索引擎开发之连接器connector(二十九)
    solr&lucene3.6.0源码解析(四)
    solr&lucene3.6.0源码解析(三)
    elasticsearch 7.7.0 最新版+Java High Level REST Client测试
    自制聊天软件测试
    网页正文内容抽取测试
    Kernel Functions for Machine Learning Applications
    Latent semantic analysis note(LSA)
    jQuery插件备忘
    比较成系列的文章[备份.感谢这些作者的辛苦]
  • 原文地址:https://www.cnblogs.com/zhangchenliang/p/4329992.html
Copyright © 2011-2022 走看看