zoukankan      html  css  js  c++  java
  • SAP Actual Costing with Material Ledger 激活实际成本后台配置

    Actual Costing with Material Ledger

    1      Purpose

    This configuration guide provides the information youneed to activate MaterialLedger and Actual Costing manually.

    The application component Actual Costing/Material Ledger fulfillstwo basic objectives: The ability to carry material prices in multiplecurrencies/valuations, and actual costing.

    Before activating the material ledger, make sure theactivation is necessary. Make sure you know which currencies and valuations youwant to use, because you cannot go back and change the setting.

    If you use the Actual Costing/Material Ledgercomponent, you must also use Logistics invoice verification becauseordinary invoice verification does not support Actual Costing/Material Ledger.

    After activatingthe material ledger, you should do period end closing without fail, otherwiseyou will have reconciliation issues at the end of the year. To reverse theprocess requires a lot of efforts and difficulties and you may need supportfrom SAP.

    Activation Options:

    If you just want to use the Actual Costing/Material Ledgercomponent to carry material inventory values in multiple currencies/valuations,you must activate the material ledger. In addition, you can choosetransaction-based price determination (price determination indicator inmaterial master record = 2). If you do this, you still have the option ofdeciding between price control standard price and moving average price for yourmaterials.

    If you want the system to calculate a periodic unit pricefor your materials based on the actual costs incurred in a period, you willneed to activate actual costing in addition to activating the material ledger.In addition, you must choose single-level/multilevel price determination foryour materials (price determination indicator in material master record = 3).In this case, you must use price control standard price for all materials thatyou want to use in actual costing.

    If you want to include variances from cost centers andbusiness processes in addition to the material cost variances in actualcosting, you must activate activity consumption update in the quantitystructure in addition to activating actual costing.

    Work in Process (WIP) is not included in Actual Costing in SAP standard system. And this is not included in our solution. Tobring WIP to actual costing, SAP has a special development you can add to theMaterial Ledger cockpit called WIP revaluation. See note 608162. Note this function is only releasedwith restriction.

    2     Preparation

    2.1  Prerequisites

    Before you start installing this ConfigurationGuide, you must install all the Baseline building blocks. You may eitherinstall the Building Material Industry Building Blocks before or after you workthrough this Configuration Guide.

    No Goods Movement must be entered in theperiod you activate the Material Ledger, that is the Material Ledger has to beactivated at the start of a period.

    3     Configuration

    3.1  Preparing Master Data

    3.1.1  Creating G/L Accounts

    Use

    In this step, you create G/L accounts that are not included inthe chart of accounts 00100010 and are to be used in material ledger. Theassignment of these accounts is described in a later step 3.2 Automatic Account Assignment for Material Ledger.

    Procedure

    1.     Accessthe activity using one of the following navigation options:

    SAP ECC menu

    Accounting  ® Financial  Accounting ® General  Ledger ® Master  Records ® G/L  Accounts ® Individual  Processing ® Centrally

    Transaction code

    FS00

    2.     Onthe EditG/L Account Centrally screen, enter theaccount number and the company code 1000.

    3.     ChooseCreate (theicon right to the field Company Code).

    4.     Maintainthe data in each tab as following:

    Type/Description tab

    G/L Account

    Account Group

    P&L statement  acct

    Short Text

    G/L Acct Long Text

    531030

    PL

    X

    Acc/def acct. ML

    Accruals/deferrals account material ledger

    531050

    PL

    X

    Adjust. act. rate ML

    Adjustment of activity actual rate material ledger

    531040

    PL

    X

    Consmp.revalu. ML

    Consumption  Revaluation Material Ledger

    531020

    PL

    X

    Pr.dif.lower.lv (ML)

    Price difference from lower level (Mat. Ledger)

    531010

    PL

    X

    Single-level  pr.diff

    Single-level price diffs Mat. Ledger settlement

    Control Data tab

    G/L Account

    Account currency

    Posting without tax  allowed

    Tax category

    Line item display

    Sort key

    531030

    USD

    X

    - (Only input tax allowed)

    X

    001

    531050

    USD

    X

    - (Only input tax allowed)

    X

    001

    531040

    USD

    X

    - (Only input tax allowed)

    X

    001

    531020

    USD

    X

    - (Only input tax allowed)

    X

    001

    531010

    USD

    X

    - (Only input tax allowed)

    X

    001

    Create/bank/interest tab

    G/L Account

    Field status group

    531030

    Y012

    531050

    Y012

    531040

    Y012

    531020

    Y012

    531010

    Y012

                     

    5.     Choose Save.

    Result

    The necessary G/L accounts are created.

    3.1.2  Check the setting in Classify G/L Accounts for Document Splitting

    Use

    This activity is necessary only if you have activated documentsplitting (BB 165 ActivateDocument Splitting).

    For document splitting to be possible, the individual documentitems and the documents must be classified. For the individual document items youdo this by assigning them to an item category. The item category is determinedby the account number. In this step, you assign the new created accounts to anitem category.

    Prerequisite

    Document splitting is activated.

    Procedure

    1.     Accessthe activity using one of the following navigation options:

    Transaction code

    SPRO

    IMG menu

    Financial  Accounting (New) ® General  Ledger Accounting (New) ® Business  Transactions ® Document  Splitting ® Classify  G/L Accounts for Document Splitting

    2.     Ifthe DetermineWork Area: Entry dialog box appears, enter Chart of Accounts 0010 then choose Continue.

    3.     Onthe ChangeView “Classify G/L Accounts for Document Splitting”: Overview screen,make sure the following entries exist:

    Acct from

    Account to

    Cat.

    Description

    500000

    599999

    06000

    Material

    4.     ChooseSave.

    Result

    The G/L accounts are checked to be classified for documentsplitting purpose.

    3.1.3  Creating Primary Cost Element

    Use

    If you decide to activate activity consumption update in a plantyou need a profit and loss account for the closing entries in ActualCosting/Material Ledger for transaction GBB/AUI (Credit cost center/processwith actual price adjustment) in OBYC. You must create this G/Laccount as a primary cost element. The credit to the cost center or businessprocess is identified under this cost element.

    Prerequisite

    The G/L account is defined.

    Procedure

    1.     Accessthe activity using one of the following navigation options:

    SAP ECC menu

    Accounting  ® Financial  Accounting ® General  Ledger  ® Master  Records ® G/L  Accounts ® Individual  Processing ® Centrally

    Transaction code

    FS00

    2.     Onthe EditG/L Account Centrally screen, enter the G/LAccount 531050 and the Company Code 1000.

    3.     ChooseEditcost element (F8).

    4.     Onthe CreateCost Element: Initial Screen, enter the ValidFrom and to date then choose Enter.

    5.     Onthe CreateCost Element: Basic Screen, make the following entries:

    Field name

    Description

    User actions and values

    Note

    CElem category

     

    1

    Primary  costs/cost-reducing revenues

    6.     Choose Save.

    Result

    The cost element for actual activity price adjustment is created.

    3.1.4  Check the Assignment of Cost Elements to Cost Element Groups

    Use

    The purpose of this activity is toassign the new cost element to one cost element group.

    Procedure

    1.     Accessthe activity using one of the following navigation options:

    Transaction code

    KAH2

    IMG menu

    Controlling  ® Cost  Element Accounting ® Master  Data ® Cost  Elements ® Create  Cost Element Groups ® Change  Cost Element Group

    2.     Onthe ChangeCost element group: InitialScreen, enter the cost element group 0010_MAT andchoose Hierarchy (F6).

    3.     Onthe ChangeCost element group: Structure screen, make sure the followingvalue exists.

    Cost element group

    From Value

    To Value

    0010_MAT

    531050

    531050

    4.     ChooseBack.

    Result

    The cost element is checked to be assigned to a cost element group.

    3.2   Defining Account Determinations for Material Ledger

    Use

    The purpose of this activity is todefine the account determinations for material ledger.

    For accountdetermination, the following transactions in OBYC shouldbe maintained when the material ledger is used:

    Transaction

    Usage

    PRD

    for price difference  posting (invoices, order settlements…)

    PRY

    for single-level  price differences (material ledger closing entry)

    PRV

    for multilevel price  differences (material ledger closing entry)

    KDM

    if applicable, for  transaction-based exchange rate difference postings (invoices, order  settlements…)

    KDV

    if applicable,  exchange rate differences from lower levels (material ledger closing entry)

    LKW

    for all difference  postings of closing entries without stock revaluation

    COC

    for the revaluation  of other consumption

    GBB/AUI

    for the revaluation  of actual prices for activity types and actual process prices in the material  ledger (AUI modification)

    Procedure

    1.     Accessthe activity using one of the following navigation options:

    Transaction code

    OBYC

    IMG menu

    Financial  Accounting (New) ® General  Ledger Accounting (New)  Periodic Processing  Integration  Materials  Management  Define Accounts for Materials Management

    2.     On the Maintain FI Configuration:Automatic Posting - Procedures screen, double-clickon transaction PRY.

    3.     Ifthe EnterChart of Accounts dialog box appears,enter Chartof Accounts 0010, and thenchoose Continue.

    4.     ChooseRulesand make the following entries:

    Accounts are  determined based on

    Debit/Credit

    <deselect>

    General modification

    <deselect>

    Valuation modif.

    <deselect>

    Valuation class

    <deselect>

    5.     ChooseSaveand make the following entries:

    Chart of Accounts

    Transaction

    Account

    0010

    PRY

    531010

    6.     ChooseSaveand Back.

    7.     On the Maintain FI Configuration: AutomaticPosting - Procedures screen, double-click on transaction PRV.

    8.     ChooseRulesand make the following entries:

    Accounts are  determined based on

    Debit/Credit

    <deselect>

    General modification

    <deselect>

    Valuation modif.

    <deselect>

    Valuation class

    <deselect>

    9.     ChooseSaveand make the following entries:

    Chart of Accounts

    Transaction

    Account

    0010

    PRV

    531020

    10.  ChooseSaveand Back.

    11.  On the Maintain FI Configuration:Automatic Posting - Procedures screen, double-clickon transaction LKW.

    12.  ChooseRulesand make the following entries:

    Accounts are  determined based on

    Debit/Credit

    <deselect>

    Valuation modif.

    <deselect>

    Valuation class

    <deselect>

    13.  ChooseSaveand make the following entries:

    Chart of Accounts

    Transaction

    Account

    0010

    LKW

    531030

    14.  ChooseSaveand Back.

    15.  On the Maintain FI Configuration:Automatic Posting - Procedures screen, double-clickon transaction COC.

    16.  Onthe MaintainFI Configuration: Automatic Posting - Rules screen, make thefollowing entries:

    Accounts are  determined based on

    Debit/Credit

    <deselect>

    Valuation modif.

    <deselect>

    Valuation class

    <deselect>

    17.  ChooseSaveand make the following entries:

    Chart of Accounts

    Transaction

    Account

    0010

    COC

    531040

    18.  ChooseSave.

    19.  ChoosePostingKey and make the following entries:

    Posting Key

    Debit

    40

    Credit

    50

    20.  ChooseSaveand Back.

    21.  On the Maintain FI Configuration:Automatic Posting - Procedures screen, double-clickon transaction GBB.

    22.  ChooseNewEntries and make the following entries:

    Chart of Accounts

    Transaction

    Valuation modif.

    General modification

    Valuation class

    Debit

    Credit

    0010

    GBB

    0001

    AUI

    3000

    531050

    531050

    0010

    GBB

    0001

    AUI

    3001

    531050

    531050

    0010

    GBB

    0001

    AUI

    3030

    531050

    531050

    0010

    GBB

    0001

    AUI

    3031

    531050

    531050

    0010

    GBB

    0001

    AUI

    3040

    531050

    531050

    0010

    GBB

    0001

    AUI

    3050

    531050

    531050

    0010

    GBB

    0001

    AUI

    3100

    531050

    531050

    0010

    GBB

    0001

    AUI

    7900

    531050

    531050

    0010

    GBB

    0001

    AUI

    7920

    531050

    531050

    23.  ChooseSave.

    Result

    The account determinations for material ledger are maintained.

    3.3  Activating MaterialLedger

    Use

    In this step, Material Ledger is activated inone or more valuation areas. When the material ledger is activated in aspecific valuation area, all the materials in that valuation area are valuatedusing the material ledger.

    If you activatethe material ledger for a plant, you should also activate it for all the otherplants in the company code. This ensures that the accounts in FinancialAccounting and Materials Management are reconciled.

    Procedure

    1.    Access theactivity using one of the following navigation options:

    Transaction code

    OMX1

    IMG menu

    Controlling  ® Product  Cost Controlling ® Actual  Costing/Material Ledger ® Activate  Valuation Areas for Material Ledger ® Activate  Material Ledger

    2.    On the Change View“Activation of Material Ledger”: Overview screen, make the following entries:

    Valuation  Area

    Company Code

    ML Act.

    Price Deter.

    Price Det. Binding  in Val Area

    1000

    1000

    X

    3

     

    1100

    1000

    X

    3

     

    3.    Save your entries.

    Result

    The material ledger of different valuation area isactivated.

    3.4   MaterialUpdate

    3.4.1  Defining Movement Type Groups of MaterialLedger

    Use

    In this step you definemovement type groups for the Material Ledger and define howconsumption is to be revaluated with these movement type groups.

    Procedure

    1.    Access theactivity using one of the following navigation options:

    Transaction code

    SPRO

    IMG menu

    Controlling ® Product  Cost Controlling ® Actual  Costing/Material Ledger ® Material  Update ® Define  Movement Type Groups of Material Ledger

    2.    On the Change View“Define Movement Type Groups for ML Update”: Overview screen, choose New Entries and make the following entries:

    MTG

    Name

    Reval. of Consump.

    CF

    FI Revaluation

    1

    CC

    FI/CO Revaluation

    2

    3.    Save your entries.

    Result

    Movement type groups are defined.

    3.4.2  Assigning Movement Type Groups of Material Ledger

    Use

    In this step you assign themovement type groups of the material ledger to specific movement types.

    Prerequisite

    Movement type groups are defined.

    Procedure

    1.    Access theactivity using one of the following navigation options:

    Transaction code

    SPRO

    IMG menu

    Controlling ® Product Cost  Controlling ® Actual  Costing/Material Ledger ® Material  Update ® Assign  Movement Type Groups of Material Ledger

    2.    On the Change View “Assign ML MovementType Groups”: Overview screen, assign Movement Type Group CC to followingmovement types:

    Trans.Type

    Movement   Type Group

    201

    CC

    202

    CC

    221

    CC

    222

    CC

    231

    CC

    232

    CC

    241

    CC

    242

    CC

    251

    CF

    252

    CF

    281

    CC

    282

    CC

    291

    CC

    292

    CC

    331

    CC

    332

    CC

    333

    CC

    334

    CC

    335

    CC

    336

    CC

    551

    CC

    552

    CC

    553

    CC

    554

    CC

    555

    CC

    556

    CC

    601

    CF

    602

    CF

    951

    CC

    952

    CC

    961

    CC

    962

    CC

    During consumption of revaluation, theconsumption items with above movement types that are assigned with CF or CC areto be revaluated using the original consumption account. With CC assignment,the CO account assignment of the original goods issue is revaluated too. Thoseremaining consumption items will be revaluated on a collective account that isdefined in transaction COC (Revaluation of other consumables) in OBYC.

    3.    Save your entries.

    Result

    Movement type groups are assigned.

    3.5   Actual Costing

    3.5.1  Activating Actual Costing

    Use

    In this step, actual costing for materials isactivated per plant and you can decide whether (in addition to materialconsumption) activity consumption and/or processes which are used to produce amaterial should be updated in the quantity structure in Actual Costing/MaterialLedger.

    Prerequisite

    Material ledger is activated.

    Procedure

    1.    Access theactivity using one of the following navigation options:

    Transaction code

    SPRO

    IMG menu

    Controlling  ® Product  Cost Controlling ® Actual  Costing/Material Ledger ® Actual  Costing ® Activate  Actual Costing ® Activate  Actual Costing

    2.    On the Change View “Activateactual costing”: Overviewscreen, make the followingentries:

    Plant

    Name 1

    Act. costing

    ActAct

    CreditCCt

    1000

    Plant 1

    X

    2

     

    1100

    Plant 2

    X

    2

     

    If you activatethe activity consumption update in the quantity structure with setting (Update is active and relevant toprice determination), you cannot usethe function Revaluation at ActualPrices at period closing in Cost Object Controlling, as the variances fromthe cost center / process are debited directly to the material. If you use thefunction Revaluation at Actual Pricesat period closing, the cost center / process will be credited twice and thematerials will be debited twice.

    3.    Save your entries.

    Result

    Actual costing is activated.

    3.5.2  ActivatingActual Cost Component Split

    Use

    In this step, actual cost component split foreach valuation area is activated.

    After this step, in case the cost component structure ischanged, it will cause inconsistency during the Material Ledger PeriodClosing.  So always make sure the costcomponent structure is correctly maintained before doing this step.

    Procedure

    1.    Access theactivity using one of the following navigation options:

    Transaction code

    SPRO

    IMG menu

    Controlling  ® Product  Cost Controlling ® Actual  Costing/Material Ledger ® Actual  Costing ® Activate  Actual Cost Component Split

    2.    On the Change View“Activate Actual Cost Components Split”: Overview screen, make the following entries:

    Valuation Area

    Company Code

    ActCstCmpSplt  Active

    1000

    1000

    X

    1100

    1000

    X

    3.    Save your entries.

    Result

    Actual cost component split is activated.

    3.6  Periodic Actual Valuation of CO-PA

    3.6.1  DefiningValue Fields

    Use

    In this activity, define a new value field for the periodic unitprice. If you want to transfer actual cost components into different valuefields as for the standard cost estimate, you need to create extra value fieldsfor each of the individual cost components.

    Procedure

    1.    Access the activity using one of the followingnavigation options:

    Transaction code

    KEA6

    IMG menu

    Controlling ®  Profitability Analysis  Structures  Define Operating Concern  Maintain  Value Fields

    2.    On the Edit Value Fields: Start screen,make the following entries:

    Field name

    Description

    Use action and values

    Note

    Create value field

    Value field

     

    VVAPR

     

    3.    Choose the Create/Change button.

    4.    Confirm the information Caution: You areprocessing cross-client data structures, with Enter.

    5.    On the Create Val. Fld VVAPR screen,make the following entries:

    Field name

    Description

    Use action and values

    Note

    Description

     

    Periodic Unit Price

     

    Short text

     

    Act. Cost

     

    Value field type

     

    Amount

    Choose Amount

    Agg.(time)

     

    SUM

     

    6.    Choose Save and Activate.

    Result

    The value field for the periodic unit priceis created.

    3.6.2  AssigningValue Fields to Operating Concern

    Use

    In this activity, assign the new value field to your operatingconcern.

    Procedure

    1.    Access the activity using one of the followingnavigation options:

    Transaction code

    KEA0

    IMG menu

    Controlling ®  Profitability Analysis ® Structures  ® Define  Operating Concern ® Maintain  Operating Concern

    2.    On the Maintain Operating Concernscreen, make the following entries:

    Field name

    Description

    Use action and values

    Note

    Operating Concern

     

    10US

     

    3.    On the Data Structure tabchoose the Display<-> Change button.

    4.    Confirm the information Caution! You arechanging/deleting cross-client settings with Enter.

    5.    Choose the Change data structurebutton.

    6.    On the Edit Data Structure:Characteristic screen, choose the Value fields tab.

    7.    On the Edit Data Structure: Value Fieldscreen, choose the value field VVAPR from Copy from box.

    8.    Choose the left-facing arrow Transfer fields.

    9.    Choose Save and Activate.

    10.  ChooseBack.

    11.  TheGenerateenvironment dialog box appears. Choose Yes.

    Result

    The value field for the periodic unit priceis assigned to the operating concern.

    3.6.3  DefiningAccess to Actual Costing/Material Ledger

    Use

    In this activity, define a costing key for valuation with actualcosts of goods manufactured.

    Procedure

    1.    Access the activity using one of the followingnavigation options:

    Transaction code

    SPRO

    IMG menu

    Controlling ®  Profitability Analysis  Master Data  Valuation  Set Up Valuation Using  Material Cost Estimate  Define Access to Actual Costing/Material Ledger

    2.    On the Change View “Costing Key forActual Cost Estimate”: Overview screen, choose New Entriesand make the following entries:

    Field name

    Description

    Use action and values

    Note

    Costing key

     

    YBM

     

    Costing Key for Actual Cost Estimate

    Valuation view:

     

    0 Legal Valuation

     

    Type of valuation:

     

    1 Transfer cost component  split and total cost

     

    Specify time reference

    Period a/c to line item

     

    X

     

    Period /year

         

    Plant used for reading cost estimate

    Use line item plant as cost  est. plant

     

    X

     

    Specify plant for cost  estimate:

         

    Control data

    Exclusive access according  to costing key

         

    Error message if no actual  costing found

     

    X

     

    Transfer auxiliary cost  component split

         

    3.    Double-click Val.Fld Allocatn for PeriodicMoving Average Price in the left dialog structure.

    4.    On the Change View “Val.Fld Allocatnfor Periodic Moving Average Price”: Over screen, choose New Entriesand make the following entries:

    Field name

    Description

    Use action and values

    Note

    Op.Concern

     

    10US

     

    Act. costs

     

    VVAPR

     

    5.    Choose Enter.

    6.    Choose Back twice.

    7.    On the On the Change View “Costing Keyfor Actual Cost Estimate”: Overview screen, make the followingentries:

    Cstg key

    Name

    YBM

    Building Material: Actual  Cost Estimate

    8.    Choose Save.

    Result

    The costing for actual cost estimate isdefined.

    3.6.4  AssigningCosting Keys to Material Types

    Use

    In this activity, assign the costing key to material types for periodicrevaluation of actual data.

    Procedure

    1.    Access the activity using one of the followingnavigation options:

    Transaction code

    SPRO

    IMG menu

    Controlling ®  Profitability Analysis  Master Data  Valuation  Set Up Valuation Using  Material Cost Estimate  Assign Costing Keys to Material Types

    2.    On the Set Operating Concerndialog box, enter 10US, and then choose Continue.

    3.    On the Change View “Costing Key forMaterial Type”: Overview screen, make the following entries forPV (point of valuation) 02:

    PV

    RecT.

    Plan ver.

    Mat.typ

    Valid to

    C.key 1

    C.key 2

    C.key 3

    02

    F

     

    FERT

    12/31/9999

    YBM

       

    4.    Choose Save.

    Result

    The costing key is assigned for periodicrevaluation.

    3.6.5  AssigningValue Fields for Actual Cost Component Split

    Use

    If you want to copy the actual cost componentsplit in detail you need to assign individual cost components to thecorresponding value fields. You can overwrite thestandard cost estimate with the actual cost estimate or you can create your ownvalue fields for the actual cost estimate.

    Procedure

    1.    Access the activity using one of the followingnavigation options:

    Transaction code

    SPRO

    IMG menu

    Controlling ®  Profitability Analysis  Master Data  Valuation  Set Up Valuation Using  Material Cost Estimate  Assign Value Fields

    2.    On the Determine Work Area: Entrydialog box, make the following entries then choose Continue.

    Field name

    Description

    Use action and values

    Note

    Operating concern

     

    10US

     

    Cost component structure

     

    Y1

     

    3.    On the Change View “Assign CostElements to Value Fields”: Overview screen, choose all entrieswith PV 01 then choose Copy As….

    4.    On the Change View “Assign CostElements to Value Fields”: Overview of Sel screen, make thefollowing entries, that is change PV 01 to 02:

    PV

    CCo

    Name of Cost Comp.

    F/V

    Fld name 1

    Fld name 2

    02

    101

    Direct Material

    1

    VVMAT

    VVMAT

    02

    101

    Direct Material

    2

    VVMAT

    VVMAT

    02

    102

    Credits (Co/By-Pr)Cr

    3

    VVY01

    VVY01

    02

    103

    Third Party

    3

    VV970

    VV970

    02

    109

    Material Overhead

    1

    VVOCF

    VVOCF

    02

    109

    Material Overhead

    2

    VVOCV

    VVOCV

    02

    201

    Personnel time

    1

    VVLCF

    VVLCF

    02

    201

    Personnel time

    2

    VVLCV

    VVLCV

    02

    202

    Machine time

    1

    VVMCF

    VVMCF

    02

    202

    Machine time

    2

    VVMCV

    VVMCV

    02

    203

    Set-Up time

    1

    VVMCF

    VVMCF

    02

    203

    Set-Up time

    2

    VVMCV

    VVMCV

    02

    209

    Production Overhead

    1

    VVOCF

    VVOCF

    02

    209

    Production Overhead

    2

    VVOCV

    VVOCV

    02

    230

    CH Quality Managm.

    1

    VVMCF

     

    02

    230

    CH Quality Managm.

    2

    VVMCV

     

    02

    231

    BP Chem: Energy

    1

    VVMCF

     

    02

    231

    BP Chem: Energy

    2

    VVMCV

     

    02

    301

    Miscellaneous

    1

    VVOCF

    VVOCF

    02

    301

    Miscellaneous

    2

    VVOCV

    VVOCV

    02

    305

    AdminSales overhead

    3

    VTRGK

    VTRGK

    5.    Choose Enter then Save.

    Result

    Same value fields areassigned to actual cost estimate as to standard cost estimate.

    3.7  Production Startup of Material Ledger

    Use

    The purpose of this activity is to execute the ProductionStartup for the Material Ledger activation.

    Prerequisite

    ·        Make sure that the currency settings are correct in Customizing for FinancialAccounting and in the Material Ledger. After production startup of the materialledger, no changes in thecurrencies, currency types or material ledger types are allowed.

    ·        Make sure that the attributes of the material types in Customizing forLogistics – General are correct. The only materials that will be converted arematerials with material types that allow value updates.

    ·        Make sure in Customizing that all plants in which you want to activate the material ledger areset as active for the material ledger. Check your Customizing settings for eachplant. You can retroactively set additional plants as productive and active, aswell.

    ·        Make sure that Accountingviews exist for the relevant materials in the material master records.

    ·        Make sure that no material postings in the relevantplants are necessary during the conversion. Between activation and productionstartup, the relevant plants are blocked.

    The preparation of data for production startup of thematerial ledger cannotbe reversed.

    Procedure

    1.    Access the activity using one of the followingnavigation options:

    SAP ECC menu

    Accounting  ® Controlling  ® Product  Cost Controlling ® Actual  Costing/Material Ledger ® Environment  ® Production  Startup ® Set  Valuation Areas as Productive

    Transaction code

    CKMSTART

    2.    On the Production Startup of Mat.Ledger screen, make the following entries:

    Field name

    Description

    User action and values

    Comment

    Plant

     

    for example, 1000/1100

     

    Exchange Rate Type

     

    for example, M

     

    Background Processing

         

    Test run

         

    3.    Choose Execute.

    Result

    The system does the following:

    Master data

    ·        Turns on the Material ledger active indicator in theaccounting view of all the material master records of the plant

    ·        Sets the pricedetermination indicator in the material master records to price determination 2

    ·        Creates material ledgermaster data for the current period, the previous period, and the last period ofthe previous year

    ·        Calculates prices in theother currencies for the material ledger data if, in fact, a price was maintainedin the accounting view

    ·        Notes the currency settingat the time of production startup internally

    Transaction data

    ·        Transfers inventoryquantities, inventory values and prices from material master records to thematerial ledger data for the current period, the previous period, and the lastperiod of the previous year

    ·        Calculates the inventoryvalues and prices in the currencies of the material ledger at the current dateusing the stated exchange rate type

    ·        Amends thepurchase order histories with the set currencies, using the settings foradditional currencies found in Customizing for Financial Accounting

    3.8  Changing Material Price Determination

    Use

    In this activity, changematerial price determination that is used in material master.This functionis typically used after the material ledger is installed, because at that pointall materials have price determination control 2 (transaction-based).

    If you use Actual Costing/Material Ledger, you shouldalso use standard price control of raw materials and trading goods to ensureconsistent cost management of your production process. Only in this way arevariances completely transparent within production!

    Procedure

    1.    Access the activity using one of the followingnavigation options:

    SAP ECC menu

    Accounting  ®  Controlling ® Product  Cost Controlling ® Actual  Costing/Material Ledger ®  Environment ® Change  Material Price Determination

    Transaction code

    CKMM

    2.    On the Change Material Price Determinationfor Material Ledger screen, make the following entries:

    Field name

    Description

    Use action   and values

    Comment

    Material

    Enter the material to change price decision.

       

    Plant

    Enter the plant.

    for example, 1000/1100

     

    Old Price Determination

    Enter the price decision that exists in the current material master.

    for example, 2

    Transaction-Based

    New Price Determination

     

    3

    Single-/ Multilevel

    New Price Control

     

    S

    Standard price

    Test run

         

    Save log

     

    X

     

    3.    Choose Execute.

    Result

    The price determination (and,if applicable, the price control) of the relevant material or materials ischanged in the material master record and in the material ledger data.

    You should only change the price determination settingwhen it is absolutely necessary. If you change the price control, such as from 3to 2 and back to 3, this can cause inconsistencies in material price analysis.

  • 相关阅读:
    软件测试从业者,试用期生存指南(完整版)
    学测试,看视频?NONONO,除非这种情况
    vi / vim 字符替换详解
    Centos 下 mysql 安装过程
    Web测试到底是在测什么(资料合集)
    我花了两个小时,写了这份年终总结 。
    拒绝无效加班 !
    你离月薪30K还差哪些?
    从业十年分享:你应该知道的一些测试职业事实!
    别再TM跟我说找不到满意的工作!
  • 原文地址:https://www.cnblogs.com/SlashOut/p/5024886.html
Copyright © 2011-2022 走看看