zoukankan      html  css  js  c++  java
  • River Hopscotch

    Description

    Every year the cows hold an event featuring a peculiar version of hopscotch that involves carefully jumping from rock to rock in a river. The excitement takes place on a long, straight river with a rock at the start and another rock at the end, L units away from the start (1 ≤ L ≤ 1,000,000,000). Along the river between the starting and ending rocks, N (0 ≤ N ≤ 50,000) more rocks appear, each at an integral distance Di from the start (0 < Di < L).

    To play the game, each cow in turn starts at the starting rock and tries to reach the finish at the ending rock, jumping only from rock to rock. Of course, less agile cows never make it to the final rock, ending up instead in the river.

    Farmer John is proud of his cows and watches this event each year. But as time goes by, he tires of watching the timid cows of the other farmers limp across the short distances between rocks placed too closely together. He plans to remove several rocks in order to increase the shortest distance a cow will have to jump to reach the end. He knows he cannot remove the starting and ending rocks, but he calculates that he has enough resources to remove up torocks (0 ≤ M ≤ N).

    FJ wants to know exactly how much he can increase the shortest distance *before* he starts removing the rocks. Help Farmer John determine the greatest possible shortest distance a cow has to jump after removing the optimal set of M rocks.

    Input

    Line 1: Three space-separated integers: LN, and M
    Lines 2.. N+1: Each line contains a single integer indicating how far some rock is away from the starting rock. No two rocks share the same position.

    Output

    Line 1: A single integer that is the maximum of the shortest distance a cow has to jump after removing M rocks

    Sample Input

    25 5 2
    2
    14
    11
    21
    17

    Sample Output

    4

    Hint

    Before removing any rocks, the shortest jump was a jump of 2 from 0 (the start) to 2. After removing the rocks at 2 and 14, the shortest required jump is a jump of 4 (from 17 to 21 or from 21 to 25)

    老牛过河  给出河宽 L    石头数量n  如果敲碎m个石头  问这头牛在过河过程中 跳的最近的一次 是多远

    #include<cstdio>  
    #include<algorithm>
    using namespace std;
    int shi[100001];
    int L,n,m;
    int cha(int r,int m)  
    {   
        int l=0;
           while(l<=r)
    	   { 
              int cut=0;  
               int  d=0;  
    	   	  int  mid=(l+r)/2;
    	   	        for(int i=1;i<=n+1;i++)  
                { 
    			       d+=shi[i]-shi[i-1];
                     if(d<=mid)  //判断能够跳过几个石墩 
                     {  
                      cut++;//如果能够跳过一个石墩  将其敲碎 
                      }  
                      else  
                     {  
                        d=0;   
                     }  
                  }  
                 if(cut<=m)
                 {
    
           	       	l=mid+1;
    		     }  
    		     else
    		     {
    		      r=mid-1;
    			 }
    	   }
         return l;//注意这道题输出mid  或者定义一个数来代替mid很可能过不了  反正我没过   直接输出l即可 
    }  
    int main()
    {
    	while(scanf("%d%d%d",&L,&n,&m)!=EOF)
    	{
    		for(int i=1;i<=n;i++)
    	{
    		scanf("%d",&shi[i]);
    	}
        sort(shi+1,shi+n+1);
        shi[n+1]=L;
        printf("%d
    ",cha(L,m));
    	}
    		return 0;
    }


  • 相关阅读:
    基于Android的学生电子假条管理平台(笔记18)
    基于Android的学生电子假条管理平台(笔记17)
    请假制度管理与责任规避(笔记16)
    高校学生考勤管理系统功能设计(笔记15)
    浅析普通高校考勤请假制度的困境及其解决方法(笔记14)
    浅析普通高校考勤请假制度的困境及其解决方法(笔记13)
    高职大学生非正常请假现象透视(笔记12)
    学校应该完善与落实学生考勤制度——两张与众不同的请假条的故事(笔记11)
    《基于ASP.NET技术的小区物业管理系统设计与实现》论文笔记(二十)
    《基于JSP小区物业信息管理系统的设计与实现》论文笔记(十九)
  • 原文地址:https://www.cnblogs.com/kingjordan/p/12027123.html
Copyright © 2011-2022 走看看