zoukankan      html  css  js  c++  java
  • ERS卫星

    http://www.esa.int/Our_Activities/Operations/ERS-2

    ERS-2

    ROLE Earth observation (EO)
    LAUNCH DATE 21 Apr 1995
    LAUNCHER/LOCATION Ariane 4/Kourou, French Guiana
    LAUNCH MASS 2516 kg
    ORBIT Sun-synchronous, polar, 800 km
    PERIOD 100 minutes
    NOMINAL MISSION Complete
    + Wind Scatterometer & GOME: first instruments of their kind +

    The mission

    ERS-2 is ESA's second EO mission, (after ERS-1) and was launched in 1995.

    Both carry a comprehensive payload including a Synthetic Aperture Radar (SAR) and a radar altimeter for studying sea surface temperatures and winds; ERS-2 additionally carries a sensor for atmospheric ozone research.

    When they were launched, the two ERS satellites were the most sophisticated EO spacecraft ever developed and launched in Europe.

    In March 2000, a computer and gyro control failure led to the end of ERS-1's mission. The ERS-2 mission has however continued to be a great success, lasting well beyond its original three year design lifetime and overcoming critical on-board problems.

    In 2001, after the failure of several on-board gyro systems, an innovative new scheme for flying and controlling the ERS-2 mission without gyros was invented by a group of engineers across ESA and industry- the "gyro-less" yaw steering mode or "Zero-Gyro Mode". In 2003, a failure in the on-board data storage system led to the mission being re-designed as "real-time" only, with science data directly relayed to ground at the time of acquisition. These in-flight adaptations have enabled the mission to be extended well beyond its design lifetime, and ERS-2 had already surpassed more than 82 000 orbits at the end of 2010.

  • 相关阅读:
    解决多版本sdk兼容问题
    ios5 UIKit新特性
    iPhone网络编程–一起来做网站客户端(一)
    八数码
    IOS开发中编码转换
    修复ipa图片png方法
    创建易读链接 搭建应用通往App Store的桥梁
    如何让IOS应用从容地崩溃
    详解IOS IAP
    jquery创建并行对象或者叫合并对象
  • 原文地址:https://www.cnblogs.com/lovebay/p/5118052.html
Copyright © 2011-2022 走看看