zoukankan      html  css  js  c++  java
  • 【MM MRP】PA-Unite3 Forecast(MRP_3)

    1.Basics of the Forecast

    1.1 The historical consumption values exist for the material.In addtion,you can enter historical consumption values manually as basic values for the first forecast.Also can refer to the consumptiona values of another marterial if this is no historical data for the material.

    1.2 To execute the individual forecast, go to the SAP Easy Access menu and choose:Logistics → Materials Management → Material Requirements Planning (MRP)
    → Materials Forecast → Forecast → Individual Forecast → Execute (MP30).

    1.3 To execute a forecast for an entire plant, go to the SAP Easy Access menu and choose: Logistics → Materials Management → Material Requirements Planning
    (MRP) → Materials Forecast → Forecast → Total Forecast. You can choose. between the total forecast online (MP38) or in background processing (MPBT). To avoid overloading the system, carry out the total forecast in background mode.

    2.Postprocessing of the Forecast Results

    2.1 Print list check

    choose: Logistics → Materials Management → Material Requirements Planning (MRP) → Materials Forecast → Forecast → Total Forecast→ Print (MP39).

    To print as a background job, go to the SAP Easy Access menu and  choose: Logistics → Materials Management → Material Requirements  Planning (MRP) → Materials Forecast → Forecast → Total Forecast →Print (Background) (MPDR).

  • 相关阅读:
    MySQL常用函数及逻辑运算
    博客主题2
    TCPIP详解第1卷1.3TCPIP分层1.4互联网的地址1.5域名系统1.6封装
    删除数组中满足特定需求的数字
    自定义简洁浏览器主页
    Matlab图像处理函数:regionprops
    连通域的质心
    Matlab的GUI参数传递方式总结
    retrifit
    association ,collection
  • 原文地址:https://www.cnblogs.com/potatoo/p/7521620.html
Copyright © 2011-2022 走看看