zoukankan      html  css  js  c++  java
  • POJ 1008 Maya Calendar

    Maya Calendar
    Time Limit: 1000MS   Memory Limit: 10000K
    Total Submissions: 79278   Accepted: 24367

    Description

    During his last sabbatical, professor M. A. Ya made a surprising discovery about the old Maya calendar. From an old knotted message, professor discovered that the Maya civilization used a 365 day long year, called Haab, which had 19 months. Each of the first 18 months was 20 days long, and the names of the months were pop, no, zip, zotz, tzec, xul, yoxkin, mol, chen, yax, zac, ceh, mac, kankin, muan, pax, koyab, cumhu. Instead of having names, the days of the months were denoted by numbers starting from 0 to 19. The last month of Haab was called uayet and had 5 days denoted by numbers 0, 1, 2, 3, 4. The Maya believed that this month was unlucky, the court of justice was not in session, the trade stopped, people did not even sweep the floor.

    For religious purposes, the Maya used another calendar in which the year was called Tzolkin (holly year). The year was divided into thirteen periods, each 20 days long. Each day was denoted by a pair consisting of a number and the name of the day. They used 20 names: imix, ik, akbal, kan, chicchan, cimi, manik, lamat, muluk, ok, chuen, eb, ben, ix, mem, cib, caban, eznab, canac, ahau and 13 numbers; both in cycles.

    Notice that each day has an unambiguous description. For example, at the beginning of the year the days were described as follows:

    1 imix, 2 ik, 3 akbal, 4 kan, 5 chicchan, 6 cimi, 7 manik, 8 lamat, 9 muluk, 10 ok, 11 chuen, 12 eb, 13 ben, 1 ix, 2 mem, 3 cib, 4 caban, 5 eznab, 6 canac, 7 ahau, and again in the next period 8 imix, 9 ik, 10 akbal . . .

    Years (both Haab and Tzolkin) were denoted by numbers 0, 1, : : : , where the number 0 was the beginning of the world. Thus, the first day was:

    Haab: 0. pop 0

    Tzolkin: 1 imix 0
    Help professor M. A. Ya and write a program for him to convert the dates from the Haab calendar to the Tzolkin calendar.

    Input

    The date in Haab is given in the following format:
    NumberOfTheDay. Month Year

    The first line of the input file contains the number of the input dates in the file. The next n lines contain n dates in the Haab calendar format, each in separate line. The year is smaller then 5000.

    Output

    The date in Tzolkin should be in the following format:
    Number NameOfTheDay Year

    The first line of the output file contains the number of the output dates. In the next n lines, there are dates in the Tzolkin calendar format, in the order corresponding to the input dates.

    Sample Input

    3
    10. zac 0
    0. pop 0
    10. zac 1995

    Sample Output

    3
    3 chuen 0
    1 imix 0
    9 cimi 2801

     1     Source Code
     2     Problem: 1008        User: zhaopeng938
     3     Memory: 296K        Time: 16MS
     4     Language: C++        Result: Accepted
     5 
     6 Source Code
     7 
     8 #include<iostream>
     9 //#include<fstream>
    10 #include<string>
    11 #include<vector>
    12 using namespace std;
    13 int main()
    14 {
    15     //ifstream in("test.txt");
    16     string month[19]={"pop", "no", "zip", "zotz", "tzec",
    17         "xul", "yoxkin", "mol", "chen", "yax",
    18         "zac", "ceh", "mac", "kankin", "muan", 
    19         "pax", "koyab", "cumhu","uayet"};
    20     string day[20]={"imix", "ik", "akbal", "kan", "chicchan",
    21         "cimi", "manik", "lamat", "muluk", "ok",
    22         "chuen", "eb", "ben", "ix", "mem",
    23         "cib", "caban", "eznab", "canac", "ahau"};
    24     int n;
    25     cin>>n;
    26     cout<<n<<endl;
    27     for(int i=0;i<n;i++)
    28     {
    29         int d;char pot;string m;int m_num;int y;int j;
    30         cin>>d>>pot>>m>>y;
    31         //cout<<d<<m<<y<<endl;
    32         for(j=0;j<19;j++)
    33             if(month[j]==m)
    34                 break;
    35         if(j==18)
    36             m_num=360;
    37         else
    38             m_num=j*20;
    39         m_num+=(d+1);
    40         int day_num=y*365+m_num;
    41         y=day_num/260;
    42         m_num=day_num%260;
    43         if(m_num)
    44         {    
    45             d=m_num%13;
    46             if(d==0)
    47                 d=13;
    48             m=day[m_num%20-1];
    49             if(m_num%20==0)
    50                 m=day[19];
    51         }
    52         else
    53         {
    54             y--;
    55             d=13;
    56             m=day[19];
    57         }
    58         cout<<d<<" "<<m<<" "<<y<<endl;
    59     }
    60     return 0;
    61 }
  • 相关阅读:
    objective-c保护属性
    第十七章、程序管理与 SELinux 初探 工作管理 (job control)
    第十七章、程序管理与 SELinux 初探
    Shell运算符:Shell算数运算符、关系运算符、布尔运算符、字符串运算符等
    go语言初始化内部结构体3中方式
    数据结构之C语言模拟整数数组实现
    使用python将元组转换成列表,并替换其中元素
    ruby中的类实例变量和实例的实例变量
    读<<programming ruby>> 7.6节 flip-flop 理解
    ruby逻辑判断符号
  • 原文地址:https://www.cnblogs.com/zhaopeng938/p/7552199.html
Copyright © 2011-2022 走看看