    SAP ECC 6.0

    Configuration Document



    Production Planning & Control (PP)


    1. General Settings


    1.1 Maintain Calendar



    Menu Path

    IMG  SAP NetWeaver  General Settings  Maintain calendar

    Transaction Code:

    SCAL



     Public holidays
    Definitions for public holidays: Spring festival etc.

     Public holiday calendar
    A combination of public holiday rules

     Factory calendar
    Definition working days and non-working days for a week, under the assignment of a particular public holiday calendar.

    1.1.1 Public Holidays 


     mouse click at Public holiday

     click  for changing



    Create new Public holidays Tomb sweeping day, Dragon boat festival and Mid-autumn festival under sort key “CN”



    Choose public holiday type


    Currently, the public holidays are defined to year 2015.

    Click to do extension in the future.



    1.1.2 Holiday calendar


    Go back to Main menu:

     mouse click at Holiday Calendar

     click at  for changing



    Create holiday calendar for the plant:

    C1-MSFS

    C2-MDFT (Tianjin)

    C3-MDFT (Changchun)

    C4-MGFS



    Click to insert public holiday to holiday calendar.



    Note: Holiday calendar for the plant only contains legal holidays.




    1.1.3 Factory calendar


    Go back to Main menu:

     choose Factory calendar

     click



    Create factory calendar for the plant:

    Factory calendar code

    Description

    Remark

    C0

    CN2 all days are workdays

    7 working days a week, no holiday

    C1

    MSFS calendar for work center

    6 working days a week with holiday

    C2

    MDFT (TJ) calendar

    7 working days a week with holiday

    C3

    MDFT (CC) calendar

    7 working days a week with holiday

    C4

    MGFS calendar

    7 working days a week with holiday

    C5

    MSFS calendar for plant

    7 working days a week with holiday






    1.2 Check Units of Measurement


    Menu Path

    IMG  SAP NetWeaver  General settings  Check units of measurement

    Transaction Code:

    CUNI



    Select “Units of measurement” button,


    Create a new UoM “CNY”, which is used for work center standard value parameter “tooling”.



    2. Master Data


    2.1 Bill of Materials


    2.1.1 Define Modification Parameters


    Menu Path

    IMG  Production  Basic Data  BOM Control data for Bill of Material  Define Modification Parameters


    Transaction Code:

    OS27



    This screen can set parameters for BOM which can define BOM validity maintain, support with Engineering change management, and technical setting for allow alternative BOM or Variant BOM active.



    2.1.2 Define Default Values


    Menu Path

    IMG  Production  Basic Data  BOM Control data for BOM  Define Default Values


    Transaction Code:

    OS28




    Define the default values for BOM details which there are 4 fields as:

    Field Name

    Default Value

    Remark

    Base quantity

    1.000


    BOM status

    70

    70  : Release status


    Size unit

    MM


    Var-size item unit

    PC

    Unit



    2.1.3 Define BOM usage



    Menu Path

    IMG  Production  Basic Data  BOM General data  BOM usage Define BOM usages


    Transaction Code:

    OS20




    Usage 1 “production” and usage 2 “engineering/design” are used in China BU2.



    2.1.4 Define Allowed Material types for BOM header


    Menu Path

    IMG  Production  Basic Data  BOM General Data  Define Allowed Material types for BOM header


    Transaction Code:

    OS24


    All Material types are allowed (+) for BOM header in each BOM usage.



    2.1.5 Define BOM status


    Menu Path

    IMG  Production  Basic Data  BOM General Data  Define BOM status


    Transaction Code:

    OS23



    CN2 BOM status is set to 70 when created.


    2.1.6 Define Item Categories


    Menu Path

    IMG  Production  Basic Data  BOM Item data  Define item categories


    Transaction Code:

    OS13




    Category L and T are used in CN2.



    2.1.7 Define Allowed Material types for BOM item


    Menu Path

    IMG  Production  Basic Data  BOM Item Data  Define Allowed Material types for BOM Item


    Transaction Code:

    OS14



    All Material types are allowed (+) for BOM Item in each BOM usage.



    2.1.8 Define order of priority for BOM usages


    Menu Path

    IMG  Production  Basic Data  BOM Alternative Determination Define Order of priority for BOM usages


    Transaction Code:

    OS31




    2.1.9 Define Applications


    Menu Path

    IMG  Production  Basic Data  BOM Alternative Determination Define application


    Transaction Code:

    OS30




    Create a new item ZC01 with selection ID “02” which can be used in CS11/CS12/CS13 for viewing Engineering/design BOM.




    2.2 Work Center


    2.2.1 Define Work center category


    Menu Path

    IMG  Production  Basic Data  Work center General data Define work center category


    Transaction Code:

    OP40


     Work center categories for CN2

    Machine

    Machine group

    Labor

    Labor group

    Production line


     Double click at  for example cat. 0007 production line use with task list application

    P routing for production

    R Repetitive manufacturing




    2.2.2 Define field selection


    Menu Path

    IMG  Production  Basic Data  Work center General data Define field selection


    Transaction Code:

    OPFA



    Example of cost center assignment tab, which field will can be input or hide





    2.2.3 Define parameters


    Menu Path

    IMG  Production  Basic Data  Work center General data standard value  Define parameters


    Transaction Code:

    OP7B



    Setup time:  SAP_01

    Machine time: SAP_02

    Labor time:  SAP_03

    Operation Quantity: SAP_09

    Base quantity:  SAP_08

    Besides above SAP standard parameter, create a new parameter ZCN_01: Tooling:



    The unit for this parameter is “CNY”.



    2.2.4 Define standard value key


    Menu Path

    IMG  Production  Basic Data  Work center General data standard value  Define standard value key


    Transaction Code:

    OP19



    Create a new item ZC01 for CN2,



    Standard value key

    Description

    No.

    Parameter

    Name

    ZC01

    Normal Production (CN BU2)

    1

    SAP_01

    Setup



    2

    SAP_02

    Machine



    3

    SAP_03

    Labor



    4

    ZCN_01

    Tooling



    5

    SAP_05

    Standard value 2



    6

    SAP_06

    Standard value 3

    Maximum 6 parameters can be combined to one standard value key.



    2.2.5 Define person responsible


    Menu Path

    IMG  Production  Basic Data  Work center General data Determine person responsible


    Transaction Code:

    No T-Code



    Define the people responsible for your work centers which this key, you can identify a person or group of people responsible for maintaining the master data in certain work centers.


    Plant

    Person  responsible

    Description

    2290

    001

    Production Engineering (air filter)

    2290

    002

    Production Engineering (liquid filter)

    2282

    001

    Production Engineering

    2294

    001

    Production Engineering

    2295

    001

    Production Engineering




    2.2.6 Define control key


    Menu Path

    IMG  Production  Basic Data  Work center  Routing data Define control key


    Transaction Code:

    OP00



    Define ZPC0/ZPC1/ZPC2 for CN2,






    Indicators

    ZPC0

    CN2 routing - internal proc.

    ZPC1

    CN2 routing - Milestone & Auto GR

    ZPC2

    CN2 routing - Miles w/o AutoGR

    Scheduling

    X

    X

    X

    Determine capacity requirement

    X

    X

    X

    Inspect.char.required




    Auto goods receipt


    X


    Print time ticket

    X

    X

    X

    Rework




    Print confirmation

    X

    X

    X

    Print

    X

    X

    X

    Cost

    X

    X

    X

    Schedule external operation




    External processing




    Confirmations

    2

    1

    1



    2.2.7 Determine Capacity planner


    Menu Path

    IMG  Production  Basic Data  Work center Capacity planning  Determine Capacity Planner



    Transaction Code:

    No-T code



    Plant

    Capacity planner

    Description

    2290

    SH1

    MSFS-air filter

    2290

    SH2

    MSFS-liquid filter

    2282

    TJ1

    MDFT-Tianjin

    2294

    GZ1

    MGFS

    2295

    CC1

    MDFT-Changchun



    2.2.8 Define formulas for work centers


    Menu Path

    IMG  Production  Basic Data  Work center  Capacity planning  Work center formulas  Define formulas for work centers


    Transaction Code:

    OP21



    Define below formulas for CN2.


    Capacity and costing formulas:


    Standard value

    Formula

    Detail formula

    Parameter formula

    Remark

    Setup

    ZPPC05

    Setup time

    SAP_01


    Machine

    ZPPC06

    Machine time * Operation Qty/Base Qty

    SAP_02 * SAP_09/SAP_08


    Labor

    ZPPC07

    Labor time * Operation Qty/Base Qty

    SAP_03 * SAP_09/SAP_08


    Tooling

    ZPPC04

    Tooling value*Operation Qty/Base Qty

    ZCN_01*SAP_09/SAP_08

    Only for costing


    Scheduling formulas:


    Standard value

    Formula

    Detail formula

    Parameter formula

    Setup

    ZPPC01

    Setup time

    SAP_01

    Machine

    ZPPC02

    Machine time * Operation Qty/Base Qty/Operation split

    SAP_02 * SAP_09/SAP_08/SAP_11

    Labor

    ZPPC03

    Labor time * Operation Qty/Base Qty/Operation split

    SAP_03 * SAP_09/SAP_08/SAP_11


    Detail configuration for the formula as below, example is ZPPC05




    2.3 Routing data


    2.3.1 Define number ranges for routings


    Menu Path

    IMG  Production  Basic Data  Routing Control data Define number ranges for routings


    Transaction Code:

    OP62




     Number range no. 01  start from 50000000-99999999 -> internal no. range

     Number range no. 02  start from 00000000-49999999 -> external no. range



    2.3.2 Maintain task list types and set SET/GET


    Menu Path

    IMG  Production  Basic Data  Routing Control data Maintain task list types and set SET/GET parameters


    Transaction Code:

    OP8B



    Select task list type “N”,



     No. range 01 for internal number assignment

     No. range 02  for external number assignment

     Tick at Document field for document active changing

     Tick at Mat. Field for determining that the last maintained material number is the default value in routing maintenance.



    2.3.3 Define Material type assignments


    Menu Path

    IMG  Production  Basic Data  Routing General data Define Material type assignments


    Transaction Code:

    OP50



    Task list type “N” used for material type ZPRD and ZHIB / ZUNB in CN2.



    2.3.4 Define Routing selection


    Menu Path

    IMG  Production  Basic Data  Routing  Routing selection  Select automatically


    Transaction Code:

    OPEB





    3. Production Planning


    3.1 Define Version Number


    Menu Path

    IMG  Production Production Planning  Planned Independent  Requirements  Define version number


    Transaction Code:

    OMP2


    Copy versions to language “ZH”,


    Z* versions are used for long term planning.




    4. Capacity Requirements Planning


    4.1 Define evaluation selection profile


    Menu Path

    IMG  Production  Capacity requirements Planning  Evaluation  Profiles  Define selection profiles


    Transaction Code:

    OPA2



    Create a new profile ZAPA010 by copying from SAPA010. For the order categories, only tick




    4.2 Define leveling selection profile


    Menu Path

    IMG  Production  Capacity requirements Planning  Capacity leveling and extended evaluation  Define selection profile


    Transaction Code:

    OPD1



    Create a new profile ZAPSFCS009 by copying from SAPSFCS009. For the order categories, only tick




    4.2 Define leveling overall profile


    Menu Path

    IMG  Production  Capacity requirements Planning  Capacity leveling and extended evaluation  Define overall profile


    Transaction Code:

    OPD0



    Create a new profile ZAPSFCG001 by copying from SAPSFCG001, set the selection profile as “ZAPSFCS009”.




    4. Material Requirements Planning


    4.1 Plant Parameters


    Menu Path

    IMG  Production Material Requirements Planning  Plant Parameters Carry out overall maintainance of plant parameters


    Transaction Code:

    OPPQ






     Click for maintaining

     Enter plant















    Status maintained : indicated that the values are maintained

    Status initial: indicated that no value is maintained


    Click at each topic that has been maintained to adjust value via this page directly, or navigated to its structure tree.



    4.2 Carry out Overall Maintainance of MRP Group


    Menu Path

    IMG  Production Material Requirements Planning  MRP Groups Carry out overall maintainance of MRP group


    Transaction Code:

    OPPR



    Click



    And click to see overview MRP Group values maintained




    Or you can see in each topic details when you enter plant and click




    Enter MRP group




    Then click




    Status maintained : indicated that the values are maintained

    Status initial: indicated that no value is maintained


    Click at each topic that has been maintained to adjust value via this page directly, or navigated to its structure tree.




    4.3 Number ranges


    Menu Path

    IMG  Production Material Requirements Planning  Number ranges Define number ranges for planning run


    Transaction Code:

    OM12







    Plant

    Objects

    No. range maintained

    1166

    Planned orders

    01-from no.0000000001-9999999999


    Dep. Req./Resv.

    01-from no.0000000001-8999999999


    Purch. Req.

    05-from no.0030000000-0039999999


    No. range for MRP list

    01-from no.0000000001-0049999999


    Total req.

    01-from no.0000000001-1999999999


    Sim. Dep. Req.

    01- from no.0000000001-4999999999

    2226

    Planned orders

    01-from no.0000000001-0049999999


    Dep. Req./Resv.

    01-from no.0000000001-8999999999


    Purch. Req.

    06-from no.0040000000-0049999999


    No. range for MRP list

    01-from no.0000000001-9999999999


    Total req.

    01-from no.0000000001-1999999999


    Sim. Dep. Req.

    01- from no.0000000001-4999999999




    4.4 MRP controllers


    Menu Path

    IMG  Production Material Requirements Planning  Master data define MRP controllers


    Transaction Code:





    Click


    Then






    4.5 Activate MRP area


    Menu Path

    IMG  Production Material Requirements Planning  Master data  MRP area activate MRP for MRP area


    Transaction Code:






    indicator activates material requirements planning for MRP areas at client level




    4.6 Define MRP areas


    Menu Path

    IMG  Production Material Requirements Planning  Master data   MRP area Define MRP areas


    Transaction Code:







    Click




    4.7 Activate Material Requirement Planning


    Menu Path

    IMG  Production Material Requirements Planning  Planning   Activate Material Requirement Planning


    Transaction Code:

    OMDU




    Click






    4.8 Scope of planning for Total planning


    Menu Path

    IMG  Production Material Requirements Planning  Planning   Scope of planning for Total planning


    Transaction Code:

    OM0E





    Click and enter planning scope name with description

    Select the scope name and double click




    4.9 creation indicator


    Menu Path

    IMG  Production Material Requirements Planning  Planning   define creation indicator


    Transaction Code:




    Assign creation indicator for MRP group as below




    4.10 Planning Horizon for plant and MRP Group


    Menu Path

    IMG  Production Material Requirements Planning  Planning   MRP calculation  Define Planning Horizon


    Transaction Code:

    OMDX



    Choose plant or MRP group buttom

    Then entry 999 for planning horizon(planning horizon specifies the period for the "Net change planning in the planning horizon)





    4.11 Define floats(Scheduling Margin Key)


    Menu Path

    IMG  Production Material Requirements Planning  Planning   Scheduling and Capacity parameters Define floats(Scheduling Margin Key)


    Transaction Code:

    OPPQ






    column

    Description

    remark

    Plant

    Plant: 1166 or 2226


    Name1

    Plant description


    SMKey

    Scheduling Margin Key


    Op.pd.

    Opening period(in days)


    FlbefProd.

    Float before production (in days)


    FlAftProd.

    Float after production (in days)


    ReleasPer.

    Release period(in days)







    4.12 Define scheduling parameters for planned orders


    Menu Path

    IMG  Production Material Requirements Planning  Planning   Scheduling and Capacity parameters Define scheduling parameters for planned orders


    Transaction Code:

    OPU5





    Select records for displaying

    Click



    field

    Description

    remark

    Plant

    Plant: 1166 or 2226


    Order type

    Production order type

    For all production order(*)

    ProdScheduler

    Production scheduler


    Sched.hor.det.

    Scheduling horizon(detail planning)

    The scheduling horizon is a time period that is in working days. The scheduling horizon is only in effect, if the Scheduling indicator has been set. Enter 999

    SelID:detailed

    Select ID for routing selection

    Rate.plng orzn



    SelID: rate plng



    Rcutplg horizon



    selID: roughplng



    Scheduling level

    scheduling level for adjusting basic date

    Determines which scheduling (detailed scheduling or rate-based scheduling) level is used for adjusting the basic dates when you  carry out lead time scheduling or dispatching within capacity planning.

    Adjust dates

    Adjust dates in lead time scheduling


    For capacity scheduling

    Adjusting dates when dispatching planned orders


    Scheduling type

    Key which specifies the scheduling type for detailed scheduling

    Use capacity requirement to be scheduling type

    Start in the past

    Maximum number of days start date can be in the past


    Reduction type



    Maximum reduction level



    % reduction in floats








    4.13 Define External procurement


    Menu Path

    IMG  Production Material Requirements Planning  Planning   Procurement Proposals Define External procurement


    Transaction Code:

    OMDT



    Click to define external procurement for MRP group PURC





    field

    Description

    remark

    Plant

    Plant: 1166 or 2226


    Name

    Plant description


    MRP group

    MRP group


    MRP group name

    MRP group description


    Sched.info rec/agr.

    Scheduling according to purchasing info record or agreement

    the system checks whether a planned delivery time is entered in the purchasing info record or in the outline agreement. This planned delivery time is then used to calculate the delivery date and the release date.

    Stnd purch.ordr

    Document type for Standard PR

    Doc.type subc.

    Doc.type PR for subcontracting

    Stock trans doc

    Doc.type PR for stock transfer





    4.14 Define BOM and routing selection


    Menu Path

    IMG  Production Material Requirements Planning  Planning   BOM explosion/routing determination Define BOM and Routing selection


    Transaction Code:





    you specify the priority with which a BOM usage or routing usage is selected during the planning run. Here, a sequence is usually determined which is used to select a valid BOM or routing via the criterion "Usage".







    BOM selection ID:


    Routing selection ID:



    4.15 Activate Runtime statistics


    Menu Path

    IMG  Production Material Requirements Planning  Planning  Activate Runtime statistics


    Transaction Code:





    Set 1 for Frequency : Value which determines if an entry is made in the runtime statistics for a particular material during the planning run, if the value is 1 then an entry is created for every material.




    4.16 Define storage location MRP per plant


    Menu Path

    IMG  Production Material Requirements Planning  Planning  Define storage location MRP per plant

    Transaction Code:





    Enter plant: 1166 or 2226

    Then click





    4.17 Define availability Check for Components


    Menu Path

    IMG  Production Material Requirements Planning  Procurement Proposals  Define availability check for components

    Transaction Code:

    OPPJ











    Click



    For PP module we use PP checking rule to check availability. This rule defines the checking procedure to be used for the availability check (or in Inventory Management, the missing parts check) in individual applications.


    Check

    Select record then click





    Click




    Click



    Select MRP group PURC then click





    4.18 Define order type for conversion to production/process order


    Menu Path

    IMG  Production Material Requirements Planning  Procurement Proposals  Convesion of Procurement proposals  define order type for conversion to production/process order

    Transaction Code:

    OPPE









    Click



    Plant:1166 ; order type when convert planned order to production order is ZEP1

    Plant: 2226; order type when convert planned order to produciton order is ZSP1





    Click







    Select MRP group PURC then click










    4.19 Define conversion of planned order into Purchase requisitions


    Menu Path

    IMG  Production Material Requirements Planning  Procurement Proposals  Convesion of Procurement proposals  define conversion of planned order into purchase requisitions

    Transaction Code:

    OMDV





    Click



    Enter max. no . of planned order can be read


    Click







    4.20 Define period display for period totals


    Menu Path

    IMG  Production Material Requirements Planning  Evaluation  Period totals  define period display for period totals

    Transaction Code:




    Grouping periods specify which periods are to be displayed in the period totals display of the MRP list and the stock/requirements list. If you want to split the monthly or the weekly display into a finer split, you must define this split in the section Define Individual Period Split for Period Totals(can go to Material  Requirements Planning  Evaluations Period totals define individual period split for Period totals).



    Default Settings


    The following default values are specified in the standard SAP R/3 System:

    Day

    Week

    Month

    These periods are always displayed.






    4.21 Define Receipt Elements for Receipt Days’ Supply


    Menu Path

    IMG  Production Material Requirements Planning  Evaluation  Define receipt Elements for Receipt Days’Supply

    Transaction Code:




    Click













    4.22 Define Parallel Processing in MRP


    Menu Path

    IMG  Production Material Requirements Planning  Define Parallel Processing in MRP


    Transaction Code:



    With the help of parallel processing procedures, you can significantly improve the runtime of the total planning run.To process in parallel, you can either select various sessions on the application server or various servers.





    Select Destination for parallel processing* and enter no. of sessions



    * Destination of parallel processing check from transaction SM59 (RFC destinations  Internal Connections)


    4.23 Define Error Processing in the Planning Run


    Menu Path

    IMG  Production Material Requirements Planning  Planning  MRP Calculation  Define Error Processing in the Planning Run

    Transaction Code:

    OMDY




    Click Planning run button.



    Maintain Maximum of /purchase/planned order

    Plant 1166 and 2226 =  999

    However, you should check with user it may cause by user choose improper lot size (example lot “FX” : Fix lot size).  For example: They require 10000 PC, but they maintain fix lot size/maximum lot size at 10 PC, so the system generate 1000 planned orders which is too much than limit.


    5. Shop Floor Control


    5.1 Master Data


    5.1.1 Define order types


    Menu Path

    IMG  Production Shop Floor Control  Master data  Order Define Order types

    Transaction Code:

    OPJH



    No.

    Order type

    Description

    1

    ZEP1

    MECT-Normal production order

    2

    ZET1

    MECT-Trial production order

    3

    ZSP1

    MSFT-Normal production order

    4

    ZST1

    MSFT-Trial production order



     For create the new order type start by click or will copy from old order type to create the new order type by click on toolbar.



     Order Category: 10 ( PP Production Order) System fix value for this field

     Order type: define the order type and description

     CO partner update: Semi-active

     Residence time 1: (gap between deletion flag and deletion indicator setting)

     Residence time 2: 6(one month gap between deletion indicator setting and reorganizing)

     Settlement Profile: TPP01 (TH Normal Production Order)

     StatusProfile Header:

     Save the data by click



    Remark for Thailand:

    1. For Trial production order type จะsettlement profile เป็น TPP2 (TH Trial Production Order)

    2. You must be checking the number range each of order types when have to create new order.






















    5.1.2 Define order type-independent parameters


    Menu Path

    IMG  Production Shop Floor Control  Master data  Order Define Order types-independent parameters

    Transaction Code:

    OPL8






    No.

    Plant

    Order type

    Planning

    Implementation

    Controlling

    Display profile

    1

    1166

    ZEP1

    Define master data




    2

    1166

    ZET1

    3

    2226

    ZSP1

    4

    2226

    ZST1



     For create new plant by click or you can copy by click


     Click at Planning tab




    Production version: 0 (Automatic selection of production version)

    Application: P (Routing for production)

    Selection ID: Z3

    Routing selection: 3

    Tick alternative Sequences

    Task list type: N-routing

    Tick Entry tool

    Oper./act. Increment: 0010

    BOM application: PP01 Production-general

    Reservation/purc.req. 3-immediately

    Inspection Type : 03 (In-process insp. For manufacturing order)


     Click at Implementation tab




     Click at Controlling tab



    Cstg variant planned: TP01- TH Production Order plan

    Cstg variant actual: TP02- TH Production Order actual

    Results analysis key: 000001- TH WIP-Production

    Planned cost calculation: 2 Determine planned costs when saving

    Distribution Rule(default rule): PP1-Production Mat. Full settlement


     Click at Display profiles tab



    Graphics profile : 000001

    Group : PP

    Name STANDARD

    Index : 2

    Missing part list order no. : 000001 Profile 1 Availability check for Plan/prod.order

    Missing part profile. : 000002 Profile 2 Availability collective order

    Goods movements  : 000001 Standard profile



    And then click save  









    5.1.3 Define Status Profile(not yet finish)


    Menu Path

    IMG  Production Shop Floor Control  Master data  Order Define Status Profile

    Transaction Code:

    BS02


     Click เพื่อสร้าง user status profile ใหม่




     กรอกรายละเอียด จากนั้น click



    Field

    Description

    example

    Status Number

    ลำดับของ user status ใน status profile

    1,2,3,…

    Individual Status

    Status of object


    Short text

    Individual status description


    Long text

    สามารถใน status description เป็นแบบ long text ได้


    Init. status

    เมื่อ tick status ตัวนั้นจะเป็น Initial status


    Lowest status no.

    เนื่องจาก objectสามารถมีได้หลาย status ดังนั้น การกำหนด lowest status และ highest status จึงเป็นการกำหนด ว่าจะให้ object ใน status ไหน active ในกรณีที่มี object ตัวนี้อยู่หลาย status


    Highest status no.


    Position

    Position of the status in the status display


    Priority

    Status display priority at a particular position(in case that there is the same position)


    Auth. code

    authorization key



     เลือก object types สำหรับแต่ละ user status โดย  


     เลือก  order types ตามนี้ สำหรับ user status profile

    CO production order

    PP/PM: Operation

    PP/PM: order header

     Click หรือ  มาที่ Change status profile: user profile screen จากนั้น double click แต่ละ user status  เพื่อสร้าง Business transaction control

     กด  ที่ Business transaction control screen


    Field

    Description

    example

    Business transaction

    SAP Business transaction


    No influence

    ถ้า tick จะเป็นการระบุว่า this status ไม่ influence business transactionนี้


    Allowed

    ถ้า tick จะเป็นการระบุว่า business transaction นี้จะใช้เมื่อ this status is active.


    Warning

    ถ้า tick จะเป็นการระบุว่า business transaction นี้จะใช้เมื่อ this status is active และมี warning message


    Disallowed

    ถ้า tick จะเป็นการระบุว่า business transaction นี้จะไม่สามารถใช้ได้ เมื่อ this status is active


    No action

    ถ้า tick จะเป็นการระบุ No follow-up action


    Set

    ถ้า tick the status จะถูก activated เมื่อ this business transaction is carried out



    สำหรับ user status REL เลือก ดังนี้



     กด หรือ  ไปยัง user status ต่อไป


    สำหรับ user status TECO เลือก ดังนี้


     จากนั้น





    5.1.4 Define Number ranges for orders


    Menu Path

    IMG  Production Shop Floor Control  Master data  Order Define Number ranges for orders

    Transaction Code:

    CO82


     Number ranges for MECT and MSFT: 11000000000 to 19999999999



     Click  



     Click for  Number range overview


     Click for number range group maintaining


    Production order type which has not been assigned as below;



    in case of  insert number range group; select Group->insert from menu bar



    insert values



    then

    o assign order type to number range group; select the order type then click



    select the group by   in front of the number range group  and  click at




     then





    5.1.5 Define Production Scheduling Profile


    Menu Path

    IMG  Production Shop Floor Control  Master data Define Production Scheduling Profile

    Transaction Code:

    OPKP






     Click




     Plant: MECT or MSFT Plant

     Production Scheduling Profile: 000001 Production Scheduling Profile 1

     At Material availability check: tick on Confirm av. Partial qty.

     Overalll profile for Capacity planning: SAPCRPG001 Cap. evaluation: Wk. cntr. view (graph.)

     Comfirm capacity: tick

     Finite scheduling: checked

     Confirmation

    Tick No update of Yield Surplus

    Tick Adjust Quantities in order to Actual values


     then




    5.1.6 Define Production Scheduler


    Menu Path

    IMG  Production Shop Floor Control  Master data Define Production Scheduler

    Transaction Code:

    OPJ9



     Click


    Field

    Description

    example

    Plant

    Mahle plant

    MECT, MSFT

    Production scheduler

    Production scheduler code

    100

    Production scheduler Description

    Production scheduler Description

    Production Planning

    Prodprof

    Production Scheduling Profile

    000001

    Descr.prod. profile

    Description of Production Scheduling Profile

    Production Scheduling profile 1


     จากนั้น

















    5.2 Operation


    5.2.1 Define Checking Control


    Menu Path

    IMG  Production Shop Floor Control  Operations Availability CheckDefine Checking control

    Transaction Code:

    OPJ9








     Click


     assign business function to  2 cases (order creation and order release) for each production order type



     Order Creation



    Plant: 1166 or 2226

    Order type: Production order type

    Business function.: 1-Check availability during order creation

    At Material availability area

     Checking rule: PP ( PP checking rule )

     Type comp. check: ATP check

     Collect. Conversion: 2-creation even though no material is available

    PRT availability

     Tick no check

    Capacity availability

     Overall profile: SAPSFCG013 SFC-Capacity availablity check>=3.0D

     Release Capacity: 1- User decides on creation if capacity is missing

    จากนั้น





     Order Release













    5.2.2 Define Scheduling Parameters for Production Order


    Menu Path

    IMG  Production Shop Floor Control  Operations SchedulingDefine Scheduling Parameters for Production Order

    Transaction Code:

    OPU3






     Click



     จากนั้น



    field

    Description

    remark

    Plant

    Plant: 1166 or 2226


    Order type

    Production order type

    For all production order(*)

    ProdScheduler

    Production scheduler


    Sched.hor.det.

    Scheduling horizon(detail planning)

    The scheduling horizon is a time period that is in working days. The scheduling horizon is only in effect, if the Scheduling indicator has been set. Enter 999

    SelID:detailed

    Select ID for routing selection

    Rate.plng orzn



    SelID: rate plng



    Rcutplg horizon



    selID: roughplng



    Scheduling level

    scheduling level for adjusting basic date

    Determines which scheduling (detailed scheduling or rate-based scheduling) level is used for adjusting the basic dates when you  carry out lead time scheduling or dispatching within capacity planning.

    Adjust dates

    Adjust dates in lead time scheduling


    For capacity scheduling

    Adjusting dates when dispatching planned orders


    Scheduling type

    Key which specifies the scheduling type for detailed scheduling

    Use capacity requirement to be scheduling type

    Start in the past

    Maximum number of days start date can be in the past


    Reduction type



    Maximum reduction level



    % reduction in floats
























    5.2.3 Define Confirmation Parameters


    Menu Path

    IMG  Production Shop Floor Control  Operations ConfirmationDefine Confirmation Parameters

    Transaction Code:

    OPK4





     Click


     Click Generally valid settings tab





    Plant: 1166 or 2226

    Order type: Production order type

    At checks area:

     Operation Sequence : check of operation sequence in order

     Under delivery : Defines how the system is to react during confirmation if the yield and the rework quantity fall below the order's underdelivery tolerance when the operation is finally confirmed

     Over delivery : Specifies what the system should do if the overdelivery tolerance of the order is exceeded by the confirmed yield and rework quantity during confirmation

     QM results rec.: Controls the system message that appears when you confirm an order, if QM inspection results must be recorded for an operation but no results are available yet.

     Determines whether dates in the future can be used in a confirmation (Recommend Should not Tick)

    Propose time units: tick at automatic optimization


     Click General individual entry tab



    Confirm. Type: 1 Automatic final confirmation

    At Error handling/logs area

     Tick at Act. Costs

     Tick Goods movements


     Click Operation indv. Entry using initial scrn. Tab


     

     จากนั้น






    5.2.4 Define Single Screen Entry


    Menu Path

    IMG  Production Shop Floor Control  Operations Confirmation Single Screen EntryDefine Single Screen Entry

    Transaction Code:

    OPK0




     Click





     Profile: Z00001

     Profile Description: Conf. profile for single screen entry

     

     AT Area Selection tab

    Header area: 0113 Confirmation/Order/sequence/operation/work center

    Click to preview  header area


     At detail Area as below


    Click to preview each detail area



    click




     choose Default tab



    Confirm. type: Automatic final confirmation

    Quants: No proposal

    Services: 1 Immediate proposal


     then




     Tick at standard profile to assign the profile for confirmation profile






















    5.2.5 Reason code confirmation


    Menu Path

    IMG  Production Shop Floor Control  Operations ConfirmationDefine Reasons for variances

    Transaction Code:

    OPK5


     List of error code for 1166 plant


    Etc.





     List of error code for 2226 plant



     Click


    Field

    Description

    Remark

    Plant

    1166 or 2226 plant


    Name 1

    plant description


    Reason for variance

    Reason for variance code


    Description

    Reason for variance description


     

     จากนั้น


















    5.3 Integration


    5.3.1 Define Account Assignment Cat. & Doc. Type for Requisitions


    Menu Path

    IMG  Production Shop Floor Control  Integration Define Account Assignment Cat. & Doc. Type for Requisitions

    Transaction Code:

    OPJP




    Enter NB-purchase requisition for Document type in production order category.





    看后分享


  • 相关阅读:
    两台centos,用yum install 安装,一台成功,一台失败
    django 删除默认app
    FFmpeg
    安装nginx
    django markdown格式化变量
    安装python3.8
    安装 docker
    Centos7 安装selenium webdriver环境
    收集网页数据方法
    logstash 6.3.2下载地址