zoukankan      html  css  js  c++  java
  • 团队项目讨论及计划修订版

    项目选题:

    电梯调度算法的实现和测试

    项目背景:

    Imagine we’re building a tall office building, it has the following configuration about elevators:

    Building has 21 floors, 4 elevators, many passengers use these elevators everyday (passenger weight: average 70kg. max 120kg, min 45kg).

    Other constant data: Elevator speed, door open/close time, passenger time for going in/out of the elevator.  We can make reasonable assumptions about these.

    The building has 21 floors, from floor 0, 1, ... to 20.  Floor 0 is the underground parking level, floor 1 is the lobby level. Most people come in/out the building via these 2 floors.

     

    Elevator name

    Service floor list

    Passenger limit

    Weight limit

    1

    1, 10-20

    12

    1000 kg

    2

    0-10

    10

    1000 kg

    3

    1, 10-20

    20

    1500 kg

    4

    0-20

    20

    2000 kg

    需求分析:

    功能需求

    1、四台电梯同时工作

    2、随机在各楼层生成乘客信息

    3、开始工作后不能有乘客无法抵达目的楼层

    4、生成并记录个乘客抵达目的地的总用时

    性能需求

    1、具有高可靠性和容错能力

    2、具有安全检查机制

     

     项目目标:

    1、程序模块化设计

    2、记录每个人的总路程时间

    3、完成测试

    UML图

    将本次实验对象确定为电梯,乘客,楼层

    因为有大量的相关多个对象操作,所以也可以将操作设为一个对象类

    这样分类后,各物体类中只存在类的属性和检索类的数据的方法,将修改数据的操作都放在操作类内,这样分类后产生的UML图如下:

     

     

    时间及任务划分:

    第一周:设计大致模块。

    第二周:每人进行相关知识的学习,并讨论细化程序。

    第三至五周:分工完成程序。

    第六至七周:测试并优化程序,根据情况增加相应功能模块。

    第八周:进行最后微调并检查。

  • 相关阅读:
    HDOJ 1846 Brave Game
    并查集模板
    HDU 2102 A计划
    POJ 1426 Find The Multiple
    POJ 3278 Catch That Cow
    POJ 1321 棋盘问题
    CF 999 C.Alphabetic Removals
    CF 999 B. Reversing Encryption
    string的基础用法
    51nod 1267 4个数和为0
  • 原文地址:https://www.cnblogs.com/djzu/p/5401848.html
Copyright © 2011-2022 走看看