zoukankan      html  css  js  c++  java
  • Case 架构的实际应用-1

    We use testlink to manage cases, and the frame is below:

    Project Name

      -All Features(Modules)

        -Feature 1

          -UI

          -Function

            -Workflow

            -Detail(Sometimes, the case needs to give the explanation for current expected result)

          -Performance

          -Forward Compatibility

          -508   

      -Security

      -Browser Compatibility

        -Inactive Cases

    Note 1: Sub features can be added into parent feature test suite

    Note 2: Priority(Importance):

      High: Positive workflow; Workflow used mostly by customers; Negative workflow but with serious potential issues; Function accross modules with serious potential issues

      Medium: Workflow used least by customers; Negative workflow with medium potential issues; Function accross modules with medium potential issues; Limit Verification; Special Chars

      Low: Typo; UI; Negative workflow with minor potential issues;

    Note 3: Security-We can use Subgraph Vega to scanner(Subgraph Vega is an open source security test tool)

    Note 4: For each release, we will add new cases, how to seperate the new ones to existing ones? 

      We ues "Keyword" to seperate the new ones to existing ones. Set keyword to current release version, such as 2013 Dec Release

    Note 5: For new cases, we will still follow the case frame, and if the requirement changes, the case need to be updated in time.

    Note 6: Execute Cases Order: Execute High priority cases firstly, then medium priority cases, at last Low priority cases

    Note 7: Partial Regression Test: Only execute high priority cases, if time available, continue to execute some medium cases (focus on function accross modules)

    Note 8: Full Regression Test: Execute all priority cases from High to Low

    Note 9: Smoke Test: Some High Priority cases: Positve workflow used mostly, and do not block our current cycle test work

    Note 10:Happy Path Test: Listed in excel and the tester can follow the items to verify the basic function and configuration

    Note 11: Smoke Test is often used when a new version released to QA in an iteration

        Partial Regression Test is often used between feature complete and Code Freeze

        Full Regression Test is often used between Code Freeze and Golden Build

        Happy Path Test is often used after the Golden build released to Beta env/Stage env/Pro env

    Note 12: The granularity should be improved. A case should have not too many checkpoints. A case should verify a workflow or an operation.

  • 相关阅读:
    jmeter-CSV Data Set Config
    阿里云linux安装jmeter并进行压测
    HTTP基本认证和JWT鉴权
    Jmeter处理cookie
    Jmeter中一些概念的理解——90%响应时间、事务、并发
    Jmeter使用吞吐量控制器实现不同的用户操纵不同的业务
    Jmeter实现从csv文件中随机读取数据
    Jmeter解决乱码问题
    Docker简介
    docker-compose搭建wordpress[转]
  • 原文地址:https://www.cnblogs.com/limei/p/3319637.html
Copyright © 2011-2022 走看看