zoukankan      html  css  js  c++  java
  • 【MM ECC VS S4】MM模块中ECC与S4的区别

    原文出自 https://blogs.sap.com/2017/04/28/comparison-of-simplification-and-functionality-in-s4-and-ecc-in-procurement-process/ 

    Functionality/Element ECC S/4
    Material Master
    • Material Number length is 18 characters
    • Service Master is used for Services.
    • Material Number length 040 characters
    • MRP fields – Quota arr. Usage, SLoc MRP indicator, spec. proc. type SLoc , reorder qty and replenishment qty are not required to be switched on.
    • A new Material type ‘SERV” for service material. However, service material type “DIEN’ is also available.
    Vendor Master
    • Master data is maintained separately for Vendor and Customer.
    • Only one single address
    • No integrated classification data
    • No time – dependency
    • Supplier evaluation is only on hard facts only and supplier evaluation for soft-facts using questionnaire is not available but only in SAP Supplier Life cycle management.
    • No integration to Dun &Bradstreet Information Services
    • Business partner concept is used as a replacement for Vendor and Customer Master.
    • The roles available are “000000” – Business Partner (Gen), “FLVN00” – FI Vendor and “FLVN01” – Supplier.
    • Multiple addresses are possible.
    • Multiple roles
    • Time dependency object attributes and relationships
    • Purchasing Category: Suppliers can be managed according to specific categories of goods and services.
    • Classification: Assign important characteristics to suppliers. A score card for each supplier to monitor supplier’s social responsibility compliance
    • Own questionnaire can be defined directly and evaluation requests can be created and distributed directly to appraisers.
    • Support of Dun &Bradstreet Information Services  data
    Purchase Requisition
    • If no source of supply is assigned automatically by the system, Buyer needs to do this manually.
    • System proposes automatically a set of available sources of supply to facilitate and accelerate assignment of source of supply.
    • Grouping, filtering and downloading capabilities of open purchase requisitions.
    Purchase Order processing
    • Search for existing POs is time –consuming, no provisioning of existing documents.
    • No prefilling of other fields based on supplier.
    • No pre-filtering of value help search results.
    • Only at the end get a list of errors that need to be corrected.
    • Dynamic prefilling and provisioning of fields based on selected supplier or material type.
    • Restricted list of available value help fields to avoid subsequent errors in purchase order.
    • Draft purchase order is created automatically when session is lost or retrieved automatically upon returning.
    Output Management
    • The output management configuration is based in NAST.
    • The configuration is based on BRF+ (Business Rule Framework Plus) based on Adobe server and Adobe Forms. But NAST configuration is still supported for New documents.
    Contract Management
    • Only one-time search for contract documents is possible.
    • No action can be done directly in the contract list
    • Approval information is missing
    • Notes are missing
    • All activities can be executed in one screen
    • Contract target value or target quantity update
    • Approval details, notes, business card for supplier are provided
    Invoice processing
    • Inflexible search functionalities
    • Confusing visualization of Supplier invoice to detect issues
    • Administrator has to resolve business issues in case of faulty supplier invoice
    • Flexible and dynamic search capabilities
    • Defect issues in one glance
    • Directly resolve issues finish the process
    1. 物料主数据
    ECC
    • 物料号长度18位
    • 服务使用服务主数据
    S/4
    • 物料号长度40位
    • MRP字段 – Quota arr. Usage, SLoc MRP indicator, spec. proc. type SLoc , reorder qty and replenishment qty 不再需要被开启。
    • 新的物料类型SERV用于服务型物料。然而,服务物料类型DIEN依然可用。
    2. 供应商主数据
    ECC
    • 客户和供应商主数据分开维护。
    • 只有一个单独的地址。
    • 没有集成的分类数据。
    • 没有时间相关性。
    • 供应商评估只能基于“硬事实”,而不支持调查问卷等“软事实”方式,软事实方式仅在SAP Supplier Life cycle management中被支持。
    • 不支持到邓白氏信息服务的集成。
    S/4
    • 业务伙伴被用于替代供应商和客户主数据。
    • 可用的角色是“000000” – 业务伙伴 (通用), “FLVN00” – FI供应商 和“FLVN01” – 供应商。
    • 支持多个地址。
    • 支持多个角色。
    • 时间相关的对象属性和关系。
    • 采购类别:供应商可以按照采购不同货物或服务的类别进行管理。
    • 分类:分配重要的特征给供应商。用每个供应商一个计分卡的方式来监控供应商的社会责任合规性。
    • 可以自行定义问卷调查,评估请求可以被创建并直接发给评估者。
    • 支持邓白氏信息服务。
    3. 采购申请
    ECC
    • 如果系统没有自动分配货源,采购员需要手工分配。
    S/4
    • 系统自动建议一组可用货源,方便和加速货源分配。
    • 未清PR的分组,过滤和下载功能。
    4. 采购订单处理
    ECC
    • 搜索已经存在的PO是很花时间的,无法提前准备已经存在的凭证。
    • 无法用基于供应商的某些字段做提前数据准备。
    • 无法提前对值进行筛选来帮助提升搜索结果。
    • 只在最后得到一个结果,关于哪些错误需要被改正。
    S/4
    • 基于选定的供应尚或物料类型的,动态的数据预载入。
    • 支持字段的有效值筛选,避免采购订单中的后续错误。
    • 当连接丢失时,自动保存草稿版的PO,待连接回复后可继续编辑。
    5. 输出管理
    ECC
    • 输出管理的配置是基于NAST。
    S/4
    • 配置基于BRF+ (Business Rule Framework Plus) ,和Adobe server和Adobe Forms。但是NAST依然可用。
    6. 合同管理
    ECC
    • 对合同凭证,只可以一次性搜索。
    • 不允许直接在合同清单中进行操作。
    • 缺少审批信息。
    • 缺少注释。
    S/4
    • 所有的活动可以在一个屏幕内完成。
    • 合同目标值或目标数量更新。
    • 提供了审批信息,注释,供应商名片。
    7. 发票处理
    ECC
    • 搜索功能不灵活。
    • 供应商发票界面令人困惑,问题发生时,不容易找到。
    • 当错误的供应商发票出现时,系统管理员需要解决业务问题。
    S/4
      • 灵活和动态的搜索能力。
      • 一目了然就能找到问题。
      • 直接解决问题,结束流程。
  • 相关阅读:
    手把手玩转win8开发系列课程(5)
    一道百度之星编程大赛题的随笔联想·(2)
    手把手玩转win8开发系列课程(7)
    手把手玩转win8开发系列课程(10)
    一道百度之星编程大赛题的随笔联想·(1)
    手把手玩转win8开发系列课程(6)
    手把手玩转win8开发系列课程(9)
    手把手玩转win8开发系列课程(3)
    Innodb 表修复
    NoSQL之【Redis】学习(二):配置说明
  • 原文地址:https://www.cnblogs.com/potatoo/p/6871953.html
Copyright © 2011-2022 走看看