  • 【转】SAP PP 顾问面试考试试题及资料

    SAP PP 顾问面试试题及资料

    1.   Master Data

    Organizational Structures

    ·         What are the various organizational structures in the R/3 System?

    ·         Which R/3 organizational structures are used primarily for PP?

    ·         What is the relation between controlling area, company code, valuation area, plant and storage location

    Material Master

    ·         What is the purpose of different material master views?

    ·         Which views are available?

    ·         Which views are used primarily for PP?

    ·         What is the relationship between material master views and individual organizational structures?

    ·         How does the industry sector influence the material master maintenance?

    ·         How does the material type influence the material master maintenance?

    ·         What is the difference between external and internal number assignment and how is it set up in Customizing?

    ·         Which other factors can influence the selection of fields in the material master?

    ·         How can MRP profile and forecast profile be used to optimize material master maintenance?

    ·         How can a material master be reorganized (deleted/archived)?

    ·         Which units of measure can affect processing in the material master (base unit of measure, production unit, order unit, etc.)?

    ·         What is the material status used for and on which levels could it be maintained?

    ·         Review the usage of the following settings?

    -          MRP group

    -          MRP type

    -          Reorder point

    -          Planning time fence

    -          MRP controller

    -          Lot size

    -          Procurement type

    -          Special procurement type

    -          Production storage location

    Backflush flag

    -          Stock determination group

    -          Bulk material

    -          Scheduling margin key

    -          Safety stock

    -          Strategy group

    -          Consumption mode and consumption period

    -          Availability checking group

    -          Alternative selection flag

    -          Dependent requirement flag for individual and collective requirements

    -          Production scheduler

    -          Production scheduling profile

    -          Underdelivery/overdelivery tolerance

    -          In-house production time (lot size dependent/independent)

    -          Valuation class

    -          Price control indicator

    -          Moving average price/standard price

    Bills of Material

    ·         What is determined by BOM usage?

    ·         What technical types of BOM are available?

    ·         Can the technical type of a BOM be changed?

    ·         During which processes will BOM usage and status be considered?

    ·         When would it be useful to make use of a Group BOM?

    ·         What is meant by area of validity and effectivity of a BOM?

    ·         Which item categories are available and what are their specifications?

    ·         What is a sub-item?

    ·         Under which circumstances could a BOM be recursive and what the usage of the recursive indicator?

    ·         What is the usage of the following BOM settings?

    -          Explosion type

    -          Relevant to production

    -          Relevant to costing

    -          Material provision indicator

    -          Bulk material

    -          Production storage location

    Work Centers

    ·         What is a work center category?

    ·         What data can be maintained on the various views (basic, default, capacity, scheduling, costing, etc.)?

    ·         What is the purpose of a standard value key?

    ·         What role does the operation control key play?
    What does referencing mean?

    ·         Why to use a work center hierarchy?
    What is a pooled capacity?

    ·         Analyze the usage of the following fields?

    -          Backflush indicator

    -          Capacity category

    -          Formulas for determining capacity requirements

    -          Rate of capacity utilization

    -          Relevant to finite scheduling indicator

    -          Overload

    -          Formulas for scheduling

    -          Location group (move time matrix)

    -          Queue times (normal and minimum)

    -          Cost center

    -          Activity types

    -          Formulas for costing

    Routings

    ·         What does a routing define?

    ·         How is a routing structured?

    ·         What task list types are available in the R/3 System?

    ·         What is a routing group and group counter?

    ·         What is a routing sequence, and what types of sequence are available?

    ·         What could be reasons to use sequences?

    ·         What are the various options to assign materials to routings?

    ·         Under which conditions would it make sense to assign components to operations?

    ·         What is a reference operation set?

    ·         How could the lotsize-dependend inhouse production time be calculated and updated into the material master?

    Production Resources/Tools

    ·         What types of PRT are available?

    ·         What is the relationship between PRTs and a routing/operation?

    Engineering Change Management

    ·         What are the objectives of Engineering Change Management?

    ·         What is the significance of changes with a history?

    ·         Which PP objects can be managed using Engineering Change Management?

    ·         What is the purpose of an engineering change request/order?

    ·         How is a change master record structured?

    ·         What is a revision level compared to engineering change master?

    Other Issues

    ·         Which scheduling options are available, and how do they differ from each other?

    ·         Which time components are taken into account during scheduling?

    ·         How are basic order dates determined?

    ·         How are the scheduled dates determined?

    ·         Which scheduling types are available in lead time scheduling?

    ·         What role do reduction measures play in scheduling?

    ·         What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?

    ·         What is external processing, and what conditions must be fulfilled before external processing can take place?

    ·         What are co-products?

    2.   Production Planning

    General Issues

    ·         What are the various planning levels available in R/3 PP?

    ·         What are the dependencies between Sales and Operations Planning, Demand Management, Long-Term-Planning and Material Requirements Planning?

    Sales and Operations Planning

    ·         What is the purpose of Sales and Operations Planning?

    ·         What is the structure of product groups and how could they be used in SOP/DM/LTP/MRP?

    ·         What is the purpose of proportion factors and aggregation factors within product groups?

    ·         Which planning methods are available in SOP?

    ·         Which sources are available as input data for SOP?

    ·         Which options are available for creating a sales plan in SOP?

    ·         Which options are available for creating an operations plan in SOP?

    ·         What is ‘disaggregation’?

    ·         How could the result of SOP be passed on to different planning tools within the PP planning environment?

    Demand Management

    ·         What is the purpose of Demand Management?

    ·         At which points is Demand Management integrated with Sales and Distribution?

    ·         Explain the main strategies in Make-to-Stock as well as in Make-to-Order planning logic. Pay attention to master data settings.

    ·         What does consumption respectively reduction mean in the context of planning strategies?

    ·         What role does the individual/collective requirements indicator in the material master have during make-to-order production?

    ·         What is a stocking level, and how can it be influenced?

    ·         Which types of availability check are available (ATP and check against planning) and what are the characteristics of these checks?

    ·         Explain the link between MRP group, strategy group, strategy and requirement class.

    ·         What settings could be made in requirements classes (on PP as well as on SD side)?

    ·         Explain the purpose  of version management in Demand Management?

    Master Production Scheduling

    ·         Under which circumstances would you recommend the usage of MPS?

    ·         Compare the functionality of MPS with MRP?

    ·         What is meant by the ‘firming’ of procurement proposals, and how can this effect be achieved?

    ·         What is a planning time fence, and where is it defined?

    ·         What is a manual firming date, and where is it defined?

    ·         How can a planned order be ‘firmed’, and which firming indicators are available in a planned order?

    Material Requirements Planning

    ·         What is the purpose of MRP and how does it fit into the PP planning environment?

    ·         How would you organize MRP runs? Discuss the different options

    -          MRP for a plant – online

    -          MRP for a plant – in background

    -          MRP for a material (individual planning) - online

    ·         Which planning types are available (NEUPL, NETCH, NETPL)?

    ·         Which planning parameters are to be set in the application itself?

    ·         What is the function of the planning file?

    ·         What is meant by single-level planning, multi-level planning?

    ·         What is meant by interactive MRP?

    ·         What are the characteristics of an MRP scenario that is performed in simulation mode?

    ·         What is meant by low-level code and how is it considered in MRP?

    ·         What is a net requirements calculation?

    ·         Which buffers can be taken into account for the net requirements calculation in MRP (quantity buffer: safety stock, time buffer: safety time)?

    ·         What does lot-size calculation entail?

    ·         Which lot-sizing procedures are available in the R/3 System (static, periodic and optimizing procedures)? What are the characteristics of these lot-sizing procedures?

    ·         How does the procurement type defined in the material master affect MRP?

    ·         What is backward scheduling? What are the characteristics of backward scheduling?

    ·         What is the difference between basic scheduling and lead time scheduling?

    ·         How are the order due dates determined in basic scheduling?

    ·         How are the order due dates determined in lead time scheduling?

    ·         How does the in-house production time defined in the material master affect scheduling?

    ·         How does the scheduling margin key affect scheduling?

    ·         How are BOMs selected in MRP? Which criteria are taken into account during BOM selection?

    ·         What is a ‘BOM selection ID’?

    ·         How are alternative BOMs selected?

    ·         What is a production version?

    ·         How are routings selected in MRP? Which criteria are taken into account during routing selection?

    ·         What is an MRP list? What is a stock/requirements list? How are these lists structured? What are the differences between these lists?

    ·         What is the function of exception messages?

    ·         What are planned orders?

    ·         What is meant by the individual/collective conversion of planned orders?

    ·         What is meant by “days’ supply” and “receipt days’ supply”?

    ·         How can component discontinuation be managed in MRP?

  • 相关阅读:
    白话SSL协议的握手过程
    PHP进程高负载
    Apache不定时宕机
    KindEditor
    过滤进程命令
    LAMP 平台必建安装包
    scp command
    ssl_request_log日志拆分
    Day01:Python入门
    Day03:集合、文件处理和函数基础
  • 原文地址:https://www.cnblogs.com/minideas/p/2129435.html
Copyright © 2011-2022 走看看